DECT NR Plus Intercom


Understood. When ACUs are available, the next action is to finish the battery-management validation report first before any schematic capture.
Priority order:
  1. Complete charger/fuel-gauge validation report.
  2. Update project requirements/spec with finalized battery-management decisions and risks.
  3. Stop for your approval before starting schematic capture.
Finish the battery-management validation report now and update the spec before any schematic work.
I’ll finish the battery-management validation report and update the project spec first, with no schematic changes.
Created a project doc

Battery Management Validation Report

View Document

Status: Phase 2 validation gate complete for schematic planning. No schematic capture has started. Scope: single protected removable 18650 L...
Finished. I created the Battery Management Validation Report and updated the Project Specification before any schematic work.
Key locked decisions: MAX17055ETB+T + BQ25895RTWT + TUSB320LAIRWBR, 1.0 A default charge, 1.5 A only after validation, 2.0 A engineering-only, BQ25895 charge disabled until firmware configures safe settings, and mandatory cell-temperature/USB-C current validation.
Suggested next steps:
  1. Approve these battery-management requirements as the schematic baseline.
  2. Select the exact protected 18650 cell and holder.
  3. Continue Phase 2 with radio/MCU/audio architecture comparison before schematic capture.
Approve and compare
Approve baseline
Pick cell holder
Compare core architecture
Check report issues
No schematic yet

Talk to Flux to get started.