Rev C is revised in place with the trap-ID and mass reconciliation, fluid-specific failure tables, blackout budgets, and matching nitrogen/argon pressure cases. I’m now checking those deliverables and the archival preservation; the modeled tables do not establish physical trap elimination, safe relief capacity, or a qualified common coupling.
Verification found one connection-model error: detached pockets in the recovery circuit were routed to the fixed receiver instead of retaining their own recipient. I’m correcting those graph rows and refreshing the linked calculations and audit records; the mass reconciliation and budget calculations passed their checks.
Revised Rev C in place in Loop Architecture Study in project files, with the four task tables, complete modeled ID/mass reconciliation, blackout budgets, nitrogen/argon cases, and linked calculations and audits; verification found and corrected one detached-recovery routing error.
Corrected Rev B/A were left untouched, with the archived-tail readback limitation disclosed; R-CL10 remains unchanged, D-interface scope remains a Founder question, and no design or release changes were made.
Physical safety and common-interface qualification remain blocked—next priorities are actual valve/cavity drawings and inventories, the approved receiver/pressure basis, and measured parked heat leaks.