DOGS Placement Eval Run


The placement pass is complete: all 130 parts are inside the board with no reported overlaps, bounds, keepout, edge, or switching-stage findings. I’m independently checking the result and final design-review status before closing.
Thought for 5 mins 3 sec
Thought for 20 sec
Awaiting 1 task
"PCB Placement Review" completed.
Independent review found three local bypass/bootstrap refinements: C28 at U2 and C22/C38 at U6. The edge connectors are correctly aligned to the board edge and intentionally overhang mechanically; I’m applying those three fixes and re-running explicit placement checks.
Thought for 9 mins 7 sec
Thought for 9 sec
Thought for 7 sec
Awaiting 1 background task
"PCB Placement Complete" completed.
All 130 components are placed on the 100 × 100 mm board. U2/U3/U5/U6 power stages are compact, including corrected placement of bootstrap/bypass capacitors C28, C22, and C38.
Open items
  • 182 airwires remain, as expected before routing.
  • Edge connectors intentionally overhang the outline while their edge rules remain aligned.
Suggested next steps
  1. Configure power-net widths and copper zones.
  2. Route the switching stages first.
  3. Route remaining signals and run full DRC.
  4. Clean up silkscreen and test-point labels.

Placement Refresh Review
Final corrective pass — 2026-09-15, current result
This section supersedes the historical radius and missing-reference statements below. Geometry has been corrected; visual silkscreen signoff is still blocked. No component, connector, pad, net, BOM value, footprint, trace or stackup was changed in this corrective pass.

Table


Requested itemStatusEvidence / specific blocker
1. Enable actual 1 mm corner radiiCompletedExplicitly set Layout cornerRadius to 1mm with disabled:false. Readback retains 50 × 60 mm and four layers. Baked outline is a rounded rectangle with tangent points (±24,±30)/(±25,±29), establishing 1 mm arcs on all four corners.
2. Restore eighteen missing referencesCompleted as physical vector geometry; visual acceptance openAll eighteen are now included in the Top silk asset, alongside the other 92 references. See positions below. R8 uses a leader because its immediate corridor cannot accommodate a full-height label.
3. Replace malformed annotationsCompleted replacement; failed to obtain final visible signoffDisabled superseded board-level native text and replaced it with one supported SVG-backed Top Line primitive, containing actual centerline glyph paths rather than font-dependent strings. 126 annotations total: 110 component references (connector references include functions) plus 16 legends. Layout raster still has broken diagnostic text and white-on-white silk; it is not a usable visual proof.
4. Preserve edge connector mating overhangCompletedNo parts moved. J2 remains (-18,-25.9), J5 (19,22), J6 (19,-18) mm. Fresh edge-placement check reports no finding.
5. Rerun requested checksCompletedFresh review at 2026-09-15T01:29:20.235Z: zero errors; six switching-stage advisories listed below.
Routing, electrical modification, footprint repairUnattempted intentionallyOutside corrective scope. Overall board/manufacturing completion is not claimed.
Vector silk implementation

corrected-top-silkscreen-264fb75f-2dfc-4bb9-a46a-7a4e7586d80f

Corrected Top silkscreen source is referenced by Corrected Top Silk - 110 references and 16 legends, a Top-side Line at (-25,+30) mm, with unit scale and 0.15 mm stroke. SVG viewport is 50 × 60 mm; file coordinates map x+25, 30-y. Glyph centerlines are 0.85 mm high with 0.15 mm strokes, giving approximately 1 mm overall height. Rotations are 0°/90°. No `
  • Final corrective pass — 2026-09-15, current result

  • Vector silk implementation

  • Previously missing reference positions

  • Exact remaining selected-check advisories

  • Visible-legibility answer and handoff

  • Historical placement and labeling record (superseded where noted above)

  • Current disposition — 2026-09-15

  • Assigned-scope status

  • Edge anchors and access

  • Mechanical items not fully verified

  • Exact remaining placement advisories

  • Silkscreen work and limits

  • Read-only verification and handoff

  • Added scope — functional silkscreen and identity, 2026-09-15

  • Added-scope status

  • Exact placed legends

  • Electrical evidence and intentional omissions

  • Verification limits and next handoff