Work Done
None of the implementation plan tasks have been completed.
Remaining Tasks
- Fetch ERC and DRC review results via the review tool and summarize all errors and warnings.
- Modify net designators for power and ground rails (VBUS, PP5V, LDO_3V3, 3.3V, DVDD, AVDD, GND).
- Add I²C pull-up resistors for SDA and SCL (generic resistors, proper value) and connect them to the 3.3 V net.
- Add decoupling capacitors (100 nF and 1 µF at each IC VDD/V+ pin, 10 µF bulk per rail) and connect to GND.
- Update package properties of generic Rs/Cs to 0603 and assign correct footprints to active components.
- Re-run ERC/DRC reviews and confirm all issues are resolved.
Success Criteria Status
- ERC/DRC passes without errors or warnings: ❌ not yet validated
- Power nets continuity: ❌ not yet verified
- Per-IC decoupling capacitors: ❌ not yet placed
- Footprints correctness: ❌ not yet reviewed
Next Step
Run the ERC/DRC review tool to gather the current error and warning report so we can begin addressing connectivity, naming, decoupling, and footprint issues.