I’ll proceed one verified step at a time. First, I’m only checking the handheld’s current routing state and fresh DRC results; I won’t modify anything until that exact baseline is known.
Baseline complete: 9 airwires, 1 copper overlap, and 6 ERC errors. Following the required order, I’ll fix only the single P1 copper overlap next, then rerun that one check before touching routing.
First step complete: the P1 copper overlap is fixed and verified.
  • Replaced the offending HH_ILIM trace with a clearance-safe route.
  • No components or protected USB-C differential copper were changed.
  • Airwire count remains 9.
Next step will be addressing one airwire only.
Start the next step
Next step: I’ll route only the RXD airwire, keep all placement fixed, and then rerun the airwire and copper checks before proceeding further.
The RXD routing attempt was blocked by local congestion. The test route was fully reverted, leaving the board unchanged at 9 airwires and 0 copper overlaps.
Next single step requires approval: reduce RXD only from 0.15 mm to 0.13 mm trace width to create a legal escape path without moving components. Approve this rule adjustment?

Waiting for input


Design Repair Summary
Scope Result

Table


ItemStatusResult
Handheld battery and runtimeCompleted for schematic basisSelected EEMB LP502030 protected 1S LiPo, 250 mAh, approximately 20.5 × 32 × 5.3 mm. Published limits used for planning are 250 mA maximum charge and 500 mA maximum discharge; the existing approximately 201 mA BQ24074 setting is compatible pending received-pack polarity and thermal qualification.
Handheld peak-current reconciliationCompletedThe approximately 90 mA figure is the 3.3 V rail TX-plus-support peak; approximately 116 mA is the reflected battery peak at 3.0 V and 85% efficiency. The 250 mA figure is the prior conservative pack qualification floor, not an expected operating peak. The selected 500 mA-rated pack exceeds both.
Receiver wide-input powerCompleted for schematic basisContinuous POC input remains 12–48 VDC, 58 V maximum non-transient. L10 is now specified as 150 µH shielded, Isat ≥2.1 A, thermal current ≥1.5 A, DCR ≤0.25 Ω, -40 to +125 °C; final MPN and land pattern remain a PCB release gate.
Machine analog safe-state controlCompleted at schematic levelAdded U19 command optocoupler, Q1 default-off high-side arm switch, hardware GPIO pull-down, delayed arm network, U20 isolated-supply monitor, coordinated U15 RESET, receiver-side CS bias, and AD5293 SDO pull-up. U18 input LEDs are powered only from ISO_OUTPUT_ARMED. The A path retains its approximately 10 kΩ effective end-to-end resistance; the W path retains 3.9 kΩ series limiting.
Machine connection qualificationBlockedAuthoritative AD5293 terminal/sequencing evidence was not servable by the datasheet evidence tool. Do not connect to a welding machine until simulator tests confirm terminal current, startup/brownout behavior, mapping accuracy, fault response, and harness pinout.
Dual Maverick adapter mappingBlockedAuthoritative contact-by-contact mapping remains unavailable; field connection is prohibited.
Flextec adapter releaseIncomplete release gateIntended mapping is documented, but final harness continuity, machine-interface measurements, and controlled simulator/machine testing remain required.
RF regional assumptionsDocumentation completedCurrent 915 MHz implementation is a US915-class assumption only. Regional frequency plan, module variant, antenna match, certification path, and conducted/radiated testing are release gates for every sales region.
Final schematic reviewCompleted with known metadata errorsFocused review found no floating pins, single-pin nets, unspecified LED polarity, or legibility warnings. Eight pre-existing missing-power-source typing errors remain on HH_SYS, 3V3_HH, 5V_RX, and 3V3_RX; connectivity is intact but the available PWR_FLAG symbols are not recognized as drivers by ERC.
Safe-State Sequence
  1. U10 machine-enable GPIO is held low by R47 during reset/high impedance.
  2. A validated command drives U19; Q1 remains off by R49/C46 unless the command persists.
  3. Q1 raises ISO_OUTPUT_ARMED, which powers both U18 input LEDs and releases U15 RESET through R51.
  4. Loss of the command immediately removes U18 LED drive and pulls U15 RESET low through R42.
  5. U20 reports isolated-5-V presence to U10 on RX_ISO5V_OK. Firmware must deassert enable on any absent/fault transition and must require a fresh validation sequence before re-arming.
  6. C46 delays re-arm after isolated-rail recovery; this is a mitigation, not a substitute for bench brownout/recovery testing.
Verification Evidence
  • RX_MACHINE_ENABLE: U10 PA0, U19 input drive, and 100 kΩ hardware pull-down.
  • ISO_OUTPUT_ARMED: Q1 collector, R44/R45 PhotoMOS LED resistors, R50 discharge resistor, and R51 RESET release.
  • ISO_DIGIPOT_RESET_N: 100 kΩ pull-down to MACH_COMMON, released only while armed.
  • RX_ISO5V_OK: U20 isolated feedback to U10 PA8 with 10 kΩ pull-up.
  • RX_SPI_CS_N: added receiver-side 10 kΩ inactive-state pull-up.
  • ISO_SPI_MISO: added 2.2 kΩ pull-up for AD5293 open-drain SDO.
  • MACH_REF_INT: U18 channel, U15 A terminal, and R40 remain directly connected so the 0–10 V range is not attenuated. U15 20 kΩ in parallel with R40 20 kΩ presents approximately 10 kΩ, limiting normal A-terminal current to approximately 1 mA at 10 V; D15 remains the external transient clamp.
Release Blocks
  • No machine connection until exact adapter continuity and machine-interface electrical limits are verified.
  • No claim that the AD5293 is protected under all unpowered/transient cases until simulator fault injection proves it.
  • No PCB release until L10 has a sourced MPN and verified land pattern.
  • No battery procurement release until connector housing, lead polarity, protection circuit, and received-pack dimensions are inspected.