Combined Repair Pass Handoff
Actual state of latest session
Acknowledged combined repair request, retrieved routing/manufacturing/lifecycle guidance, and updated checklist only. No component, net, copper, charging or export changes were made before ACUs ran out. Do not describe this pass as implemented.
User request
Apply BOTH uploaded repair lists in one bounded pass, verify, and deliver one downloadable ZIP. Preserve 40 × 45 mm outline, antenna exclusions, internal ground planes, both USB ports, side switch and TC2030 programming interface. User now explicitly requests working automatic battery charging, superseding temporary charging inhibit once a verified safe circuit is implemented. Existing 500 mAh prototype battery and approximately 100 mA charging remain planning assumptions; verify specifications.
Supplied evidence—not independently verified
Routing review claims and proposed repairs
- Actual USB_DN interruption is bottom trace crossing TC2030 J6 alignment hole H2: NPTH 0.99 mm at (-10.46,-8.016), not a faulty via. Prior repair attempts targeted wrong location.
- Replace USB_DN path (-12.45,-11.025) -> (-12.45,-10.575) -> (-9.25,-7.375) -> (-9.25,-6.4) with 0.15 mm bottom trace via (-11.00,-9.575), (-9.25,-9.575), ending (-9.25,-6.4). Verify drill clearance and geometry first.
- Remove GND via (-6.99,-9.57), bottom segment down to (-6.99,-11.79), tiny top stub; reported 0.032 mm clearance to C10 3V3 pad. Retain valid grounding at lower via.
- Remove under-U5 S-to-OE GND trace with reported 0.071/0.086 mm gaps; add 0.25 mm drill/0.45 mm pad GND via at (-5.90,-12.60), 0.15 mm trace to GND pad (-5.04,-12.60). Verify remaining OE/S grounding.
- Move USB_DN via (-5.05,-10.00) to (-5.05,-10.20), reconnect both traces (reported 0.11 mm clearance).
- Remove genuinely dead-end vias/stubs at USB_DN (-13,-11.875), USB_DP (-6.5,-10.9), 3V3_SW (1.75,-16.75), and J6 pin1 stub (-14.27,-7.635) to (-14.27,-8.8), only after confirming no intended connectivity is lost.
- Fix silk overlaps C10/U5, TP4/TP5, TP8 and L3/C4.
- Review claims USB FS tolerates 90 ohm +/-15%; verify applicable specification before changing rule. Do not accept blanket assertion impedance does not matter.
- Exclude bare pads J6/TP1–TP11 from BOM/placement as appropriate, not from PCB. Handle off-board RT1 separately: cell NTC is still a required assembly item if retained.
- Verify MPN suggestions R1/R2 RC0603FR-075K1L, R7 RC0603FR-0710KL against values/footprints; D2 manufacturer Texas Instruments.
- J2 shell pads 6–12 reportedly floating: verify and ground consistently with agreed shield strategy.
- D356 reportedly offset 1.5 mm: verify/correct or omit with explicit release note.
Charging proposal and decision caveat
- TS currently reportedly reaches TP6/U6 but no installed cell sensor; comparator permit reaches TP8 only; CE held disabled unless TP9 driven.
- Proposed R13 input move CHG_COMMISSION_ENABLE to CHG_TEMP_PERMIT may enable automatic charging, but verify U6 polarity, sensor bias, thresholds, open/short behavior and Q1 logic from exact datasheets before mutation.
- Sensor alternatives in supplied file: three-wire pack through S3B-PH-SM4-TB, or board-mounted NTC where battery contacts board, or fixed resistor (unacceptable as cell-temperature protection).
- Selected Adafruit 1578 500 mAh pack does not automatically imply built-in third-wire NTC. Do not invent sensor wiring or silently substitute unqualified pack. A thermistor physically attached to cell with defined connector/assembly is a valid avenue if verified and documented.
- A board sensor cannot be represented as cell sensing without proven thermal attachment. Do not enable charging by bypassing TS with fixed resistor.
- Retain ~100 mA settings if confirmed: R4 8.87k, R5 ~410 mA input limit, R9 71.5k timer ~9.5h; verify exact IC equations, USB source rules and battery specs.
- Do not add optional USB-C data or indicator redesign; keep scope bounded.
Existing work and artifacts
Next actions
- Verify and implement safe automatic charging/sensor interface plus assembly property cleanup.
- Apply evidence-based local drill/clearance/routing repairs; fresh zero-airwire and clearance/drill checks.
- One fresh independent review of changed charging/routing, then focused fixes only.
- Export fresh Gerber, KiCad, BOM and pick-place; run manufacturing-file-verification, inspect NPTH/copper interference, netlist alignment, placements and exclusions. Bundle files, reports and explicit assembly/battery instructions into ONE ZIP. Report pass/fail/not-run accurately. Do not claim production validation or measured runtime.