Qorvo DWM3001C Board Design


flux

I’ve read both repair files and will combine them into one bounded repair-and-export pass in Agent mode. That includes the drill-hole routing fix, clearance repairs, grounding and BOM cleanup, plus a functioning charger with verified cell-temperature sensing and automatic enable—while preserving the outline, antenna exclusions, both USB ports, and programming access.
I’ll retain the selected 500 mAh battery and approximately 100 mA charge rate unless verified specifications require a change; I won’t substitute a fixed resistor for temperature protection or assume a board-mounted sensor measures cell temperature. I’ll verify the proposed charger logic and thresholds before applying them, then deliver one ZIP with fresh files and explicit check results—not promise production readiness unless those checks pass.
Continue in Agent Mode

flux

I’ll combine both supplied repair lists into one pass: correct the routing and clearances, make charging automatic with real cell-temperature sensing, then regenerate one ZIP with fresh check results. I’ll preserve the approved outline and interfaces and verify the proposed fixes before applying them.
Created a project doc

Combined Repair Pass Handoff

View Document

Combined Repair Pass Handoff Actual state of latest session
Acknowledged combined repair request, retrieved routing/manufacturing/lifecycle guidance, and updated checklist only. No component, net, copper, charging or export changes were made before ACUs ran out. Do not describe this pass as implemented.
User request
Apply BOTH uploaded repair lists in one bounded pass, verify, and deliver one downloadable ZIP. Preserve 40 × 45 mm outline, antenna exclusions, internal ground planes, both USB ports, side switch and TC2030 programming interface. User now explicitly requests working automatic battery charging, superseding temporary charging inhibit once a verified safe circuit is implemented. Existing 500 mAh prototype battery and approximately 100 mA charging remain planning assu...

flux

I saved both repair lists and the charging requirements in the Combined Repair Pass Handoff, but no board changes or new exports were completed this session. The routing/clearance repairs, safe automatic charging implementation, and verified replacement ZIP remain outstanding.
Execution stopped because your ACUs ran out.

Waiting for input


Board Bring-Up Plan
Protected-bias follow-up and mandatory startup/timer gate
Latest schematic includes U7TPS70933DRVR,R15=330Ω1%0603,C15=100nF16V input afterR15,C16=10uF10V output. U6/C14,EN2,R11 andR16/R17 pullups useCHG_BIAS_3V3; R3CE pullup uses SYS, not rawVBUS or delayed helper output. U7GND3/EP7ground,EN4 intentionallyfloating,NC2/5NC. R11=560k/R12=130k; nominalreference0.621739V. R5=3.74k1%,BQ407.75mAtyp/464.54mAmax initial; helper-startup1.4V disabled and=500mA USB-C only,linkOPEN: CE must exceed1.4V andremain disabled,includingrampsverified onemulatorfirst. R5=3.74k1%,helperR15startup/DCbounded;whole-source486.39mAscreening,notU2-onlyorinstantaneousinrushbound. No arbitrary-PC-port enumeration/current-advertisement claim. 3. SW1OFF: EN low via R10=100k, module rail decays/off while charger/power-path and U6 remain USB-C powered. Charger can later operate with module off. Off does not mean zero battery drain. SW1ON:3.3V stable no load,30mA and250mA pulsed loads over3.0..4.2V battery emulation. Preliminary ripple=8h under documented cutoff/battery condition; estimated11.36h is not measured,24h aspirational. Debug/stuck-idle/BLE connections can invalidate model. Verify both USB cable bodies, switch and pogo access, antenna clearances, battery overhang/swelling/NTCwire routing and thermal copper;34×26mm remains provisional packing target, not a frozen outline or absolute optimum.
Final native ERC and connectivity —2026-10-10
Current follow-up verification and scoped item status
Final schematic 62 components/34 nets (one pre-existing empty Net1). Fresh native ERC 04:09:31.612Z:14 Errors,0 Warnings, unchanged diagnostic set; all14 dispositions below retained, withEN2nowonprotectedU7bias. At 04:09:49.267Z, floating/no-connect/shorted/single-pin/missing-footprint checks returned no Error/Warning findings. Read-onlynetandcomponentinspectionconfirmedrawVBUScontainsJ1/C1/D2/U2IN/R15only,protectedrail8pinsincludingU6VCC/EN2/C14/C16/divider/statuspullups,R3SYSbacked,CE3pinsQ1/R3/U2,openTP8/TP9separatenets,andbothstatus3pinnets. U7NC2/5/EN4marksandground3/EP7confirmed. FinalreadbackR4/R5/R6exact0402MPN/packageagreementandR9precision0603confirmed. USBisolationandexistingcapacitorbanksuntouched. Noerrorssilenced;ERCdoesnotprovethermal/startup/current/surgesafety.

Table


Assigned follow-up itemStatusEvidence / remaining gate
Whole-source current marginCompletedR5=3.74k,R15boundedhelper,486.39mADCscreening;C1hotpluginrushbenchunattempted
Protected U6/EN2/CE biasCompletedU7regulatedhelper,SYSCEpullup;netreadback;no undefinedsurgeclaim
Explicit resistor MPNs/ratingsCompletedExactYageotableinPowerBudget,propertiesreadback;R4–R6footprints0402,R9precision0603
L3Irms/Isat correctionCompletedBournsmanufacturerPDFread,1.9A/2.5Apropertiesconfirmed
TS/CEstartup and cumulative timer caveatsCompleted documentation; charge release blockedCE-highTSexcitationunresolved;emulatorcoldstart/hotrecovery/thermalcyclingtestsmandatory;CEresetsratherthanpauses
CompactCHG/PGOODaccessCompletedTP10/TP11,100kprotectedpullups,NCmarksremovedandnetsconfirmed
PCB/charging/runtime/firmware tests and orderingUnattempted, outside batchNochargeenable,nocelltests,noPCBworkororder
No assigned schematic/documentation item failed. Batch completion is not overall design completion or charging release. TP8/TP9remainOPEN; restricted supervisedprototypequalificationonly. Historical baseline before this follow-up:03:31Z had54components/30nets andthe same14ERC diagnostics. Current62components/34netsand04:09Zchecksareabove. Normalbuildcheckonly,noindependent-reviewround. The tablebelowrecords the unchanged diagnosticsetwithcurrentR5andEN2netdispositions.

Table


#Component/pin/netError disposition
1U2OUT10/11 driver conflict,SYSBoth are same physical charger output and must be tied; Output/Output library artifact
2U2OUT10/11 pin-to-pin,SYSSame duplicated physical output typing; do not disconnect either
3U1VDD,3V3_SWActually driven by U3VOUT; library fails PowerOutput typing
4U5VCC,3V3_SWSame U3VOUT source, correct wire
5U2CE4,CHG_CE_NR3pullup/Q1collector provide deliberate analog/open-collector drive; transistor collector model not taggedOutput. New diagnostic, not floating
6U2ILIM12,CHG_ILIMR5=3.74kGND resistor programming, no digital driver
7U2ITERM15,CHG_ITERMR6=5.76kGND resistor programming
8U2IN13,USB_C_CHG_VBUSExternal USB-C5V input not modeled as source
9U2EN2 5,CHG_BIAS_3V3U7regulatedOUT high/EN1GND sets programmed mode; libraryOUT typingnotrecognizedaspowerdriver
10J1VBUS_B,USB_C_CHG_VBUSExternal cable input, correctly sharedUSB-C net
11J1VBUS_A,USB_C_CHG_VBUSSame external source modeling artifact
12U2TS1,CHG_TS_CELLInternally biased analog TS with RT1sensorGND,U6IN+,TP6; no digital output required. Real sensing now implemented
13U2TMR14,CHG_TMRR9=71.5kGND analog safety timer programming
14U1VUSB18,USB_MODULE_VBUSActually U4OUT/QOD switched nativeVBUS; load-switch output typing artifact
Instance IDs: U2 b9defb61-393e-43c3-8539-df278ee26e1b; U1 542fe92b-8fdf-4eed-9941-4e48e6dff429; U5 b03a29b0-dec6-41df-b7f8-1826bf630bab; J1 a16ad526-a90c-4c74-9e8c-16c9c065f44d. Evidence for BQ TS/programming dsq_7d0599358a987ac6e0aa, NTC table dsq_1578a7f68551a336f99d, comparator dsq_89321e0daf1aa35691ee, Q1pin mapping dsq_9c69e6648eba62cc1da3. USB U5map unchanged:1/2moduleDP/DN,7/8cableDN/DP,10VCC3V3_SW,5/6/9GND,3/4NC. USB-C/rawmicroUSB/moduleVBUS remain separate; all five module grounds connected. No complete supported power-stage simulation available; calculations are not SPICE or hardware validation.
Checkpoint distinction
Hardware closure completed: real cell-sensor interface, extra hot inhibit, default-open enable, charge/termination/timer values, capacitor-bank/USB connectivity confirmation and per-ERC dispositions. No missing-footprint/electrical wiring blocker found for layout of intentionally disabled hardware. Receiving/commissioning pending: actual pack identity/polarity/protection, assembly bond/insulation, full temperature-window/fault/source/thermal tests and runtime. Future firmware pending: bootloader implementation/first flash/native updates and load-profile validation. PCB work/orders/firmware implementation were unattempted by scope; no manufacturing-readiness claim.
  • Protected-bias follow-up and mandatory startup/timer gate

  • Status and safe initial assembly

  • Initial power and system tests

  • Battery receiving and sensing assembly

  • Charging commissioning — do not bridge pads beforehand

  • Runtime and physical acceptance

  • Final native ERC and connectivity —2026-10-10

  • Current follow-up verification and scoped item status

  • Checkpoint distinction