| Assigned item | Disposition | Saved outcome / blocker |
|---|---|---|
| Read qualification changes and actual footprint state | Completed | Retained the qualified C1 identity and enlarged footprint, C29/C30 additions, relay drill correction, 165 schematic components and 119 logical nets. |
| Repair C1/C29/C30 integration and capacitor-bank geometry | Failed within two bounded placement approaches; both selectively undone | First approach cleared original body conflicts but introduced17 shorts, C1 loop/return Errors, C17 past-inductor Error and D1/R1 overlap. Second approach reduced stage findings but introduced13 different shorts and retained3 body conflicts. Read-only body checks contradicted the placement tool's zero-overlap summary; no failing attempt was accepted. All affected component positions/rotations, including C7 and immediate protection neighbors, were restored. The baseline6 body/clearance Warnings and5 critical stage Errors remain. |
| Independent GND closure | Completed for11 connections | #6c37345c joined10 logic/interface ground islands; #5fc6822d joined the Q1-source ground island to J6:P2. No placement changed during routing. |
| DC2_DRIVE R2:P1 → U3:2Y0 | Failed / stopped after2 blocked searches | Searches stopped at30s then120s. Both returned no named blocking copper and an incomplete path that did not reach the destination. No DC2 copper was saved; do not claim a diagnosed blocking component or retry this unchanged approach. |
| New-capacitor connections | Unattempted intentionally / placement blocker | C3:P1→C29:1, C3:P1→C30:1 on12V_PROTECTED and C3:P2→C29:2 onGND remain. Do not commit routing to the rejected capacitor integration locations. C30 ground is already in a connected island. |
| Mains, duplicate-job quarantine and reservations | Completed preservation | All15 mains airwires remain held. No mains routes added. Rejected job fceab4f5 remains inactive; accepted first-job copper, bounded/notched ground polygon, RF reservations, stackup and isolation rules were not changed. |
| Final read-only verification | Completed, with unresolved holds | Fresh selected checks 20:31:39.592Z: 19 airwires,0 copper shorts,0 via-in-pad,0 outside-board;6 body/clearance Warnings;5 critical switching-stage Errors+5 advisory Warnings;3 intentional relay-body keepout Errors. These are selected checks, not full clearance/thermal/isolation/ERC/manufacturing acceptance. |
ZlptFyOgRpgjoGMu10HDsDK5rgO2. This writer did not submit that operation. Its nine affected PCB rule-set paths include C1, C29, C30, C3, C16, C17, C4 and D1, overlapping the exact assigned repair scope. This is an actual concurrent placement mutation, not a stale routing-job suspicion. No placement, route, trace deletion, rule change, reset, job resume or global revert was issued by this writer. Existing duplicate-job quarantine and prior routes were not altered here.Table
| Assigned item | Result / evidence |
|---|---|
| Read qualification report 5q and actual footprint state | Completed. C1's saved D12.5/P5 body representation, C29/C30 polymer footprints and existing stage were inspected; no duplicate substitution/addition. Initial fresh check at20:13:55.318Z confirmed0shorts,6body/clearance overlaps,5critical switching-stage Errors and5advisory Warnings. |
| Repair local capacitor placement | Unattempted by this writer / concurrent-writer blocker. External #2e42cc31 moved the same banks during preparation. Do not apply another precomputed move or undo this external change without identifying its owner and outcome. |
| Bounded LV routing cleanup | Unattempted / blocked upstream. No routing calls or jobs started. New current shorts and unresolved power-stage placement must be closed by the reconciled sole writer before routing. |
| Fresh routing state after external move | Completed read-only: 38airwires =23LV +15held mains, compared with30reported at handoff. LV counts: GND14,12V_PROTECTED3,3V3_PERIPH2,12V_DC1_FUSED1,DC1_NEG1,DC2_DRIVE1,SPI_CS_AUX_N1. Native output also flags21redundant objects in7groups; these were not deleted. Preserve the previously restored necessary microSD stubs. |
| Fresh selected checks after external move | Completed at20:17:57.204Z: 17copper shorts, 1body overlap(D1/R1), 0outside-board, 6critical power-stage Errors +3advisory Warnings, 3intentional relay-body keepout Errors. These are the observed post-external-move state, not changes attributed to this writer. No full clearance/isolation release audit claimed. |
routeSegment[uid^="autoRouted.auto-layout-fceab4f5-4d28-4ce1-b29c-88aa0c9d1882"], smartVia[uid^="autoRouted.auto-layout-fceab4f5-4d28-4ce1-b29c-88aa0c9d1882"], setting active=false. Fresh rule-source inspection confirms a second-job trace inactive, while a formerly colliding first-job075496c9 trace is active=true and does not match this ruleset. The job identity is therefore unambiguous and the quarantine does not target earlier/manual copper, schematic properties, RF zones or ground polygon.Table
| Assigned item | Disposition | Evidence |
|---|---|---|
| Identify second-job copper | Completed | Job-specific UID prefix fceab4f5 differs from accepted075496c9; revision comparison to #1dfe64d7 shows added second-job nodes; current rule sources identify the exact quarantine selector. |
| Surgical conflict recovery | Completed by existing saved quarantine; verified here | No new routing job, deletion, reset, global revert or rule edit in this pass. Inactive duplicate nodes remain persisted for reversibility; they are not physically deleted. Do not remove/disable the quarantine. |
| Fresh airwires | Completed | 94 ->27, now 12 LV (DC2_DRIVE1, GND11) +15 held mains; exact connections are enumerated in the preceding recovered-trial section. |
| Fresh short check | Completed | 1246 ->0 overlapping-copper findings, reviewed19:47:52.710Z. Also zero via-in-pad, invalid-layer and protected-intrusion findings. |
| Fresh power-stage / keepout checks | Completed with holds | 0 critical switching-stage Errors;1 C26 feed advisory Warning;3 intentional K1/K2/K3 body keepout Errors. Two redundant findings remain on the restored necessary SPI_MOSI/SPI_CS_SD_N escape stubs; previous deletion demonstrably introduced two airwires, so preserve them. |
| Physical deletion of inactive second-job nodes | Unattempted intentionally | Functional recovery is already established. Deletion API needs exact UID lists and offers no job/selector batch-delete argument; deactivating the unambiguous job has restored the accepted result without touching ambiguous copper. Physical removal, if desired, should be an editor/backend job-prefix purge preserving all other nodes, not whole-net deletion. |
resume, not start/reset. It applied 2262 routing nodes, reported partial, 349 -> 12 airwires, no named unrouteable nets. No second broad job or targeted routing call was launched by this writer.forbiddenLayers=Top,Mid-Layer 1,Mid-Layer 2,Bottom rule. Removed exactly those 54 traces in one net-layout cleanup, revision #c79a2c59. Logical nets, existing LV copper, barrier and RF zones were preserved. This is an observed enforcement failure, not merely missing router documentation; do not rely on this prohibition alone for another global job.filled_polygon for Mid-Layer1 GND: bounds x[-99.5,39.5], y[-49.5,49.5]mm, raw signed area approximately 7940.811mm², zero area intersection with mains/RF rectangles. The encoded contour has bridge/self-touching geometry and was normalized with buffer(0) for intersection tests; this establishes the exclusion envelope, not whole-plane electrical continuity or a complete clearance audit. Native routing_state still supplies no computed-fill area/contour table. Persisted notched GND outline remains unchanged. Geometry script and exports retained under /root/work/routing-audit on source-qualification.total, paginated; the per-page checkErrors count is not the whole total). Example collisions explicitly contain one node from job075496c9 and one from jobfceab4f5. The previous zero-short result at19:21 preceded this concurrent result.#04a5ebd3, 2026-10-20T18:43:11.887Z. This revision includes concurrent component-property edits; do not globally revert the project to discard a routing trial.run_auto_route(action:"start", startNewCampaign:false, layerOrientations:[Top0, Mid-Layer2 0, Bottom90]). No destructive reset was requested. No supported per-trace protection edit was applied.auto-layout-075496c9-ea19-463e-995f-e2058e560b03. Response: “Auto-route job paused — out of credit.” The account stop is ACU exhaustion. Campaign: attempts1; bestAirwires349; airwireDelta unknown; consecutiveNoImprovement1; stopReason none; retryAllowed true; targetedRoutingAllowed false. The brief authorizes ONE pass only: a tool's retryAllowed flag is not permission for another pass.#04a5ebd3. Identify any new/changed/deleted traces/vias without rolling back concurrent component-property edits. Verify all-layer generated copper: no mains-net routing, no LV copper at x>=40mm, and no RF-reservation intrusion, including finite trace widths and via annuli. Run fresh shorts/clearance/airwire checks. A clearly non-release layer export is authorized for internal geometry inspection if native output is inadequate; it is not a fabrication handoff. Retain trial copper only after compliance is established; remove only newly generated violating copper, or restore only routing changes while preserving concurrent schematic properties. No second autoroute pass is authorized by this brief.Table
| Assigned item | Result | Saved changes and verification |
|---|---|---|
| U1 GND escape | Completed | Authored 0.30mm wide, 0.95mm long Top neckdown from U1:GND (-67.7,-17.95) to through via (-68.65,-17.95). Added two 0.60mm plane-entry traces and vias for C26:P2 at (-68.65,-13.3) and output-return island at (-68.3,-23.8). 3 traces + 3 through vias saved; vias 0.60mm copper / 0.30mm drill. Read rule sources: manufacturing trace minimum0.127mm; neckdown exceeds minimum. The short 0.30mm section replaces the impossible broad pad escape, not the entire high-current return. Thermal/transient qualification remains open. Both U1 GND airwires are absent in fresh routing state, including after ground-shape change. No SW trace removal/approval required. |
| Bounded ground and antenna exclusions | Completed explicit geometry and local continuity; computed-fill audit incomplete | Replaced the rectangular shape of the same persisted Mid-Layer1 GND polygon with a single continuous notched outline. Bounds remain x-99.5..39.5, y-49.5..49.5mm. Each RF rectangle is excluded with >=0.25mm margin; narrow 0.25mm slots connect the cutouts to the left boundary, avoiding unsupported hole/subpath assumptions. Right-side ground remains continuous. Fresh layer-specific SVG returns exact matching polygon vertices, confirming no persisted polygon copper intersects x>=40 or the three antenna reservations. Automatic unrestricted GND fills remain disabled. Local via-to-polygon continuity is supported by the two removed U1 ground airwires. routing_state(includeComputedCopper:true) still returns no computed area/island or clipped-fill contours, so full actual-fill clipping around pads, island removal and whole-plane connectivity are not certified. No manufacturing export was generated with outstanding airwires. |
| Safe bulk-routing determination | Blocked: spatial hard-constraint assurance unavailable | Correction to earlier overly broad statement: actual forbiddenLayers definition says “Defines the copper layers that auto-layout must not use when it routes this net.” Thus there IS a supported hard per-net layer prohibition; the existing all-four-layer prohibition on nine mains nets remains. Absence of net-exclusion arguments alone does not prove mains protection is impossible. However, full-board run_auto_route exposes only start/reset/orientations, not a hard spatial keepout argument. protected is supported on net/polygon (actual copper), not on empty keepout zones; creating artificial copper in the no-copper region is unacceptable. Three focused documentation searches did not establish full-board zone-routing enforcement or guaranteed preservation of the x 349 total**, now 334 LV + 15 intentionally held mains. Zero redundant routing groups. This pass closes the two upstream ground connections, not a low-yield serial campaign. |
| Fresh selected DRC | Completed | 18:39:10.314Z: zero copper-short, via-in-pad, invalid-layer, redundant-trace, floating-copper and protected-intrusion findings. 0 critical Switching Power Stage Errors; 1 advisory C26 feed Warning remains. 3 relay-body keepout Errors remain intentional geometry crossings; earlier verified pad extents remain outside the barrier, with no change here. No full-board/release pass claimed. |
| Full routing / release | Unattempted due to bulk safety limitation | Remaining 334 LV connections plus15 held mains; existing antenna datum, relay/mains insulation/load/enclosure, thermal/transient, MLCC/DC-bias and manufacturing-stackup holds persist. Board is not fabrication-ready or authorized for energized mains. |
Table
| Assigned item | Outcome | Fresh evidence |
|---|---|---|
| Input-bank critical placement closure | Completed verification; no new move needed | Fresh Switching Power Stage checks before and after this pass both show 0 Errors, 1 Warning. Original two hot-loop Errors are absent. C26 VIN feed is an advisory Warning, not a critical Error: 6.4mm route / 4.7mm air, detour x1.38 with FB in corridor. Per placement procedure, stop moving a stage once only advisory findings remain. Saved prior bank placements and completed SW/bootstrap traces were preserved. |
| Bounded LV input-bank routing | Completed for supplied terminal set | One call joined U1 VIN/EN, C26/C1 P1, U6 VIN/EN, C3/C16 P1: 7 pairs connected, 0 blocked, explicit 0.4mm width. The C26 feed is now physically routed; its advisory detour remains. Upstream D7/D8/fuse distribution is still incomplete. |
| Bounded regulator ground-bank routing | Partial / failed at U1 escape | One call saved 7 pairs, with 2 blocked pairs. 0.6mm ground routes join U6/C16/C3/output returns and U1 bulk/output returns, but U1:GND remains disconnected from C26:P2 and the C2-return island. Blockage names Top BUCK_SW trace 884ad900-9818-4949-b50d-ee750e3030af, U1:SW and the U1:GND via escape. No repeated retry, trace removal or component movement was attempted. Router may attach through existing copper: one reported saved pair was J11:1 to C17:P2. |
| Fresh airwire counts | Completed | Baseline read this resume: 365 = 350 LV + 15 mains; final read: 351 = 336 LV + 15 mains. This pass reduced total by 14 in two successful targeted calls. Older 371 baseline predates already-saved activity; the six-airwire difference is not attributed to this pass. No routing ledger reset. |
| Selected DRC | Completed | At 18:29:54.175Z, 0 copper shorts, 0 body overlaps, 0 outside-board, 0 redundant traces, 0 via-in-pad, 0 invalid-layer findings; 0 critical power-stage Errors, 1 stage Warning; 3 keepout Errors (intentional relay-body crossings). Not a full DRC/ERC or manufacturing pass. Pre-routing feasibility check: board valid, no feasibility issues. |
| Relay pad/barrier verification | Completed geometry inspection | K1/K2/K3 pad copper radius 1.25mm; coil pads at x37.5 extend only to x38.75; nearest contact pads at x57.5 start x56.25. Thus no actual relay pad copper enters x40..55mm; each side has 1.25mm pad-to-reservation gap. Bodies intentionally bridge the barrier. Keepout and component restrictions were not weakened. This geometric result does not qualify relay insulation or mains safety. |
| Bounded GND polygon | Completed structural verification; computed clipping/connectivity unverified | Fresh tree: active rectangle d1adcbbd-fbda-4857-87f0-1a8ecc23bc70, GND, position(-30,0), size139x99mm, Mid-Layer1 only: bounds x-99.5..39.5, y-49.5..49.5mm. Both routing-state requests with includeComputedCopper:true returned airwires/redundant traces but no computed-copper area/island table or clipped polygon geometry. Exact tool gap: this output does not expose persisted-polygon computed clipping/connectivity while automatic fills are disabled. Do not infer RF clipping or connected ground plane from the tree bounds. |
| Safe bulk routing | Blocked / intentionally unattempted | run_auto_route start schema accepts only action, startNewCampaign and layerOrientations: no net subset, net exclusion, or hard per-layer keepout argument. Mains hold therefore blocks unrestricted full-board autoroute independently of targeted-call budget. Targeted routing supports one net per call with explicit polygon keepouts, not a many-net bulk batch. Both calls here hard-excluded x>=40mm on all four copper layers; no mains routing occurred. |
| Silk cleanup, full release review, manufacturing exports | Unattempted | Outside this efficient two-net pass. Existing release holds remain. No fabrication/energized-mains authorization. |
Table
| Assigned item | Status | Evidence / remaining blocker |
|---|---|---|
| Coordinated C1/C26 and C3/C16 bank correction | Failed to achieve zero critical stage findings | C1 and C16 original hot-loop findings were reported resolved during the rework. The final mutation reports a new C26 input-feed obstruction: U1.FB lies in the U1.VIN → C26.P1 corridor; trial path 6.4 mm for 4.7 mm air, detour ×1.38. Do not claim power-stage closure. |
| Preserve completed SW/bootstrap routing | Completed for this batch | U1/U6, L1/L2, C28/C8 and every trace/via were left untouched; no routing call, trace deletion, or reroute occurred. Read-only continuity confirmation remains pending. |
| Body overlap / board-bound cleanup | Completed in mutation report; independent verification pending | Last mutation reports 0 remaining overlaps and 0 out-of-bounds components. |
| Safe silk correction batch | Unattempted | ACU exhaustion. Latest delta introduces C28 and U1 label-over-pad findings; earlier full silk check had 56 warnings before bank rework, not a current total. |
| Keep no-copper barrier and component restrictions | Completed: preserved unchanged | Three K1/K2/K3 body keepout findings remain. Lead identifies their intentional body crossing as a modeling false positive; this is not a waiver for pads or copper. |
| Confirm relay pads outside x40…55 mm barrier | Unattempted | Actual pad extents were not freshly inspected in this batch. Do not assert pad clearance from body interpretation alone. |
| Verify persisted GND polygon bounds and computed copper | Unattempted | ACUs prevented fresh polygon-tree/computed-copper inspection. Prior nominal polygon bounds are x−99.5…39.5 mm, y±49.5 mm on Mid-Layer 1, but are not newly verified here. A layout image rendered a large red region; that is not proof of layer-specific clipped computed copper or RF/barrier exclusion. No API inability was established: the exact current gap is account exhaustion before the required inspection. |
| Fresh selected DRC / airwire counts | Unattempted after final mutation | Last read-only selected check was 2026-10-20T17:19:45.192Z, before the final two corrective mutations. Last known total from the preceding routing pass was 371 airwires (356 LV / 15 held mains); this is stale and must be refreshed. |
| Additional/full autorouting | Unattempted intentionally | No additional targeted routing calls were made; cumulative prior budget remains 10. Per lead's API assessment, the global autorouter has no net-exclusion API, so the mains hold independently blocks full-board autorouting; the 10-call cap is not the only electrical/routing blocker. Never invoke unrestricted autorouting. |
Table
| Part | X | Y | Rotation |
|---|---|---|---|
| C1 | −75.5 | −24.25 | 0° |
| C26 | −69.0 | −13.3 | 0° |
| C16 | −48.0 | −20.36 | 0° |
| C3 | −48.0 | −23.33 | 0° |
| C2 | −65.3 | −23.8 | 180° unchanged |
| C27 | −65.3 | −26.8 | 180° unchanged |
| C4 | −43.5 | −23.8 | 180° unchanged |
| C17 | −43.5 | −26.8 | 180° unchanged |
[uid=e1b115ae-9a80-48f9-91c3-f92878b62860__400f1db7-c03a-a15d-513d-e6da15e7a2f9.shapes_ef7caddfacce74211e178930ee22e320], relative position 2.682mm 0mm, rotation 0deg (world −65.2, −11.118; world 90°). U1's suggested label position is world (−75.175, −19.013), but it is near C1's body edge, so inspect body/text clearance before applying rather than blindly accepting it.Table
| Assigned item | Result | Evidence / remaining limitation |
|---|---|---|
| Board and layer setup | Completed | 200x100mm rectangle, four copper layers, nominal 1.600mm stackup, 35um copper, through vias only; applied manufacturing stackup reconciliation remains a release hold. |
| All-top finite placement | Completed | All 163 footprints assigned; final checks 17:13:17Z show zero body overlaps, zero outside-board findings, zero pad-access findings. |
| Three logic placements | Completed after correction | Final exact-UID inspection caught placement of nested library elements instead of outer U15/U17/U19 footprints. Outer footprints now explicitly placed at (19,3), (12,-2.5), (12,12)mm; nested local origins restored to (0,0). No functional footprint disabled. All three outside-board findings resolved. |
| Isolation/RF reservations | Completed as reservations, not qualification | Full-height x40..55mm barrier; three all-layer RF zones; every routing call also excluded the entire x>=40mm region on all four copper layers. |
| First bounded LV routing pass | Completed | Ten successful calls, 18 pairs connected, zero failed/unconnected pairs; stop budget reached. |
| Full LV routing | Unattempted beyond first pass | 356 LV airwires remain. Power distribution, ground escapes, buses and most controls are unfinished. |
| Mains routing | Unattempted intentionally | Nine mains nets forbidden on every layer; 15 mains airwires remain. No unrestricted whole-board autoroute invoked. |
| Switching-stage closure | Failed | C1 and C16 retain critical hot-loop placement Errors; see below. |
| Bounded GND plane implementation | Completed structurally; copper verification incomplete | One active GND polygon, 139x99mm centered (-30,0), explicit Mid-Layer 1 scope. Automatic unrestricted GND fill disabled. Computed-copper report returned no table after disabling automatic fills, so polygon area, clipping and actual connectivity are not independently certified. |
| Silkscreen cleanup, full ERC/release audit, exports | Unattempted | Not part of this finite closure; no release claim. |
Bounded capacitor integration and LV closure — 22 October 2026, 20:31 UTC
Routing detail and finite limits
Exact remaining blockers and next safe work
Local capacitor cleanup — stopped on concurrent PCB mutation, 22 October 2026 20:18 UTC
Exact critical placement findings in the observed external state
Exact remaining LV connection set, 38-airwire snapshot
Bounded conflict recovery verification — 22 October 2026, 19:48 UTC
Recovered trial and concurrent-routing conflict — 22 October 2026, 19:32 UTC
Completed saved work from this assigned scope
Copper geometry evidence (first-trial snapshot only)
Current state supersedes the isolated snapshot — FAILED acceptance due to concurrent write
Next safe action / release holds
Guarded full-board trial — paused by ACU exhaustion, 20 October 2026
Required continuation (no restart)
Display correction received during paused trial
Upstream routing closure — 20 October 2026, 18:39 UTC
Exact next action / approval disposition
Efficient authorized resume — 20 October 2026, 18:30 UTC
Next efficient safe action
Focused input-bank correction — interrupted handoff, 20 October 2026
Item-level outcome
Persisted final component positions
Obstruction and recovery proposal
Scope and disposition
Routing evidence
Final check evidence
Specific holds and next safe work
Source and related project files