The attempted correction removed the shuttle collision in testing, but exposed another tight paddle clearance—0.255 mm versus the required 0.35 mm—so I did not install it; the existing assembly remains unchanged and is not ready to print.
I recorded the failed check and exact remaining location in the project files’ verification and print guide.
After these repeated unsuccessful repairs, I recommend a free Flux engineer review before another geometry pass.
Get Free Expert Help
We want to get the prototype into your hands fast. Speak with one of Flux's in-house electrical engineers to review your project.
Collins, Ryan, Nico — real humans who've shipped real hardware
Current project is Vintage Agent Microphone II, brooks/vintage-agent-microphone-ii, not the original microphone project. Electrical metadata investigation completed; source-driving correction blocked at preflight, with no circuit/part/layout mutations or shared publication. No release, purchase or manufacturing-export claim.
Fresh full native review 2026-10-08T18:40:35.797Z:
Table
Category
Errors
Warnings
Disposition
Design Rule Checks
0
0
No findings returned in this category; not blanket approval
Electrical Rule Checks
3
1
MK1:VDD, MK1:GND, MK1:GND__1 undriven; LED1 unspecified type
Placement Checks / Neckdown Escape
5
3
Out of metadata scope; not waived or repaired
Placement errors: C2 power pad beside pin (suggested1.53 mm move); C3 blocks neighboring VREF (suggested0.95 mm -Y move) and power pad beside pin (1.48 mm); C4 power pad beside pin (0.98 mm); C8 power pad beside pin (2.25 mm). Warnings: C3 return-loop ratio1.86 (suggested0.67 mm toward AVSS); C8 ground-pad orientation (suggested270°) and return-loop ratio1.80 (suggested0.35 mm toward AVSS). These are checker proposals, not edits or accepted remedies. No component position or routing changed. Lead must triage these newly surfaced full-review findings separately; this report does not repeat the older blanket clean-review claim.
Actual source/terminal evidence
Current board readback: 35 physical components,21 nets. Corrected MK1 remains partUID b372cf7c-6afb-4074-9ba6-716041047fe2, version 8d671500-19ac-4298-a83e-b8ae307837ab; physical pin1 OUTPUT, pin2 VDD, pins3/4 GND. Source part terminal readback shows OUTPUT=Output, VDD=Power In, GND/GND__1=Ground. These truthful types were retained; ERC calls the ground terminals power inputs in its finding text.
3V3_IO includes U1:DREG33 pin9 and MK1:VDD pin2; GND includes J1:A1/A12/B1/B12 and MK1:GND pin3/GND__1 pin4. MK1:OUTPUT remains on MIC_RAW with C10:P1. Supply/return topology is established; unresolved metadata is not evidence of a newly introduced physical microphone fault.
Third-party shared part; no editable permission confirmed
The project-metadata reads identify owners but do not return a positive edit grant. Current board edit access is not authority to modify/publish another owner's component. No shared-source write or publication was attempted. No private part fork/replacement was undertaken without the lead proposal required by scope.
Bounded alternative investigation
The exhausted U1:DREG33 instance-target property call from the original project was not repeated. Current alternative assessed: directly edit the real DREG33 terminal inside its owning part project, versus attach a genuine schematic-only declaration flag. Source-terminal addressing is supported by the terminal-editing procedure, but shared-source access/publication and propagation to the placed version remain approval gates.
Three current help searches did not document a usable ERC source flag or external-return declaration. Closest documentation describes part schematics as terminals, terminal Properties, and publication/update workflow; it does not establish PWR_FLAG semantics or instance-terminal overrides. Canonical get_property_config confirms Pin Type applies to Terminal, with Power Out/Ground/etc options; Power Flag and Power Source both return Unknown property. These two unknown names are evidence only for those names, not proof no such feature can exist.
Library search did find two PWR_FLAG-power candidates: 9e185674-ee94-c06a-6015-54313aca000d and 133c8f82-cd54-b6c3-84af-08df245345c0. Both are owner monish000, with no footprint/layout, but their actual sole terminal pwr has Pin Type=Unspecified / Terminal Type=unspecified. Thus neither is demonstrated to declare a power output for ERC; neither was added. A name alone is not functional evidence, and adding a fictitious source or falsifying MK1 would violate scope.
Alternative mutation attempts this batch:0. This is blocked preflight, not a failed new write. Prior original-project attempt had no verified effect and its internal feedback submission failed; no ticket was filed. No new ticket submission is claimed.
Required next action / precise blockers
U1 regulator output: obtain an explicit edit grant/owner-mediated repair for shared CM108B, or lead approval for a tightly controlled project-owned fork/version proposal. Authorized terminal correction should target source terminal DREG33 pin9, truthful Pin Type=Power Out, using the already verified regulator-output evidence. Reconfirm datasheet evidence before that future write. Owner-controlled publish/update and a board-version adoption/invariance plan must be approved first; no broad replacement authorized here.
External USB supply/return: Flux support must identify a supported ERC external-source declaration recognized on existing VBUS/GND nets without a fictitious voltage source, changed MK1 types or extra physical parts. Correct ground labeling alone is not demonstrated to satisfy the driver's rule. Do not relabel a generic reusable connector's passive ground as a universal regulator output merely to silence this board. This remains separately blocked even if U1 pin9 is corrected.
LED1 warning: an authorized source-terminal/instance-role edit mechanism and fresh exact-datasheet polarity evidence are required before setting informative Cathode/Anode roles or electrical types. This batch did not repeat an invalid Ref:Pin call, edit the shared LED or claim a datasheet-backed correction.
After an approved supported edit: fresh ERC/DRC plus complete net/pin-membership, physical-count and routing/placement invariance verification. Current5 placement errors/3 warnings need lead disposition; outside this electrical-metadata assignment.
Support request should explicitly cover recognized source declarations for ground returns and CM108B regulator outputs, pin-type handling on placed part versions, and rejection of nonexistent Ref:Pin targets instead of false mutation success. Contact Flux Support. These are required capability/access resolutions, not an instruction to waive review findings.
Netlist preservation evidence
No connectivity/component/pin/net/routing mutation tools were invoked. Initial metadata and subsequent complete21-net read agree on inspected memberships; all35 physical references remain. The full second read enumerated all21 nets and31 intentional no-connects. No new source flags or physical parts, no changed MK1 pin mapping/types, no geometry edits. This is readback evidence and an empty mutation scope, not a re-exported hash/EM/physical measurement.
Net names retained: STRAP_MSEL,3V6_A,1V8_CORE,STRAP_PWRSEL,VREF_1V75,GND,USB_DM,+5V_USB,USB_CC1,VBUS_RAW,MIC_AC,STRAP_TEST,PTT_ACTIVE,3V3_IO,MIC_GATED,USB_CC2,USB_DP,STRAP_ADSEL,MIC_RAW,STRAP_MODE,LED_ANODE.
Concurrent enclosure work is intentionally isolated: no case models, geometry, mechanical files, placeholders, component positions or thickness touched. Manufacturing guide patch is limited to current project identity and electrical review. Original Oct6 package/export links remain historical HOLD artifacts, not newly checked Oct8 releases of this fork.
Assigned status
Completed: current-project identity/record reads, real source-terminal/library-flag inspection, bounded capability/access evaluation, full netlist readback, fresh native checks and electrical project-file update.
Blocked/unattempted: new source declarations, LED metadata edits, shared publication/version adoption; missing demonstrated safe mechanism and confirmed write authorization.
Unattempted/out of scope: physical placement/copper/stackup/enclosure changes, placement-check remediation, regeneration/orders and manufacturing release.
Electrical investigation batch closed with specific escalation, not clean ERC or overall manufacturing readiness.