Prototype Execution Handoff
Binding sensor decision — 2026-11-10
User explicitly chose: retain the SEN0208 baseline under electrical HOLD; resolve supply and interface guarantees before purchase or power-up; do not substitute sensors. This supersedes earlier open sensor-choice language. MB7389 research is historical only, not an authorized development or replacement path. Preserve existing firmware and pin assignments; no sensor purchase, connection or energization is released.
Current-source recheck: the
manufacturer product page and
current wiki still do not provide guaranteed trigger VIH/VIL, echo VOH/VOL with loading conditions, absolute maximum ratings or startup/peak current limits. No revision-specific manufacturer clarification has been received. A tutorial is application evidence, not a complete guaranteed DC interface specification. Historical forum statements cannot settle the current-revision guarantee.
The controlling
@first-assembly-and-commissioning now contains a ready-to-send manufacturer clarification request and evidence acceptance criteria. The request has NOT been sent. Manufacturer evidence remains necessary; no claim of electrical resolution or physical testing is made. Existing four-screw closure and actual-hardware qualification tasks remain open and unchanged.
Session state
Active bench prototype development, 2026-11-10. User approved starting the controlled modular bench prototype; do not ask again for concept approval. No physical hardware is known available; no custom schematic/PCB, purchases, upload, commissioning or field installation completed. This records batch advanced safe inventory/software preparation but did NOT resolve the main sensor supply/interface sourcing blocker. See the active sequence and exact user-only evidence checklist in First Assembly and Commissioning.
Completed digital package
- Selected official Arduino UNO Rev3 A000066 and two identical current-revision DFRobot SEN0208 V2.0 heads in Mode 0. Confirm current revision before purchase; older documentation conflicts. Same nominal 5 V rails and the UNO tutorial suggest direct-interface compatibility, but guaranteed sensor VIH/VIL/VOH/VOL are not established; no unconditional no-level-converter claim or electrical release is made.
- Materials/wiring file
prototype-materials-and-wiring~cl, firmware guide firmware-guide~7w, specification project-specification~jj, industrial design brief industrial-design-brief~ms updated/created.
- Builder reports successful PlatformIO uno build, independent rebuild from restored bundle, 4928 bytes flash and 293 bytes static RAM, no observed compiler/linker warnings; 15 plain host C++ assertions also passed ASan/UBSan. Python synthetic serial capture and plotting tested. These are software checks, NOT hardware validation or independent electrical signoff.
- Bundle: draincheck-bench-v1. Durable source/log/binary restoration asset: https://cdn.flux.ai/document_assets/draincheck-bench-v1-d222f8b6-f357-4558-aed8-5c642cbf3335 . See Firmware Guide for tested restoration commands.
- Firmware sequences sensors 250 ms apart per 10 s cycle, raw data/quality CSV, bounded waits, session time and invalid UTC by default. Survey calibration false and Z_UP_MM/Z_DOWN_MM NAN. Diagnosis intentionally always unknown, not functioning blockage classifier.
Continuation completed — 2026-11-10
Software verification is now independently reproduced: corrected log read, clean UNO build4928 flash/293 static RAM,15 native assertions, ASan/UBSan with no diagnostics, Python syntax/CLI/helpers all PASS. No source changes. Added
@first-assembly-and-commissioning and corrected supply gate in materials/guide. Manufacturer product page namesVersion2.0 but conflicts internally on supply3.0–5.5V versus detailed3.3–5V; do not assume USB nominal5V guarantees sensor max compliance. Obtain received-revision tolerance confirmation plus host/cable rail extrema/transients and actual current/entitlement before energizing heads. Whole-system electrical signoff is blocked FIRST by sourcing: no unambiguous manufacturer supply limit/guaranteed interface evidence or qualified supply/interface design has been established. AFTER that closes, physical rail/current, timing and acoustic evidence is required. Measurements cannot replace missing design ratings. Historical outstanding paragraph below is superseded for software only; mechanical handoff is unchanged.
Previous outstanding verification (historical)
Independent reviewer uy returned partial review: no concrete errors in source/wiring inspected. Manufacturer pinout/timing match code: TRIG pins 4/6, ECHO 5/7, external 10k pulldowns, 20us trigger, 45ms echo timeout, 250ms separation/10s pair interval; invalid datum/UTC and always-unknown behavior verified by source reading. All 20 restored files matched SHA256. Independent compile/tests NOT reproduced because a malformed tail command aborted shell chain before build. Retained test logs also not read. On computer draincheck-fw at /tmp/review/draincheck-bench-v1, continue with tail -n 15 logs/*.log, pio run -e uno, pio test -e native, guide sanitizer command, python3 tools/check_helpers.py. Builder success reports remain not independently reproduced, not refuted. Whole-system power margin and USB supply tolerance/current allowance remain unclosed. No revision-source conflict beyond already documented seller confirmation requirement. No need repeat datasheet research.
Mechanical work — separate ownership
Earlier “no CAD exists” statements are obsolete. Existing provisional dry-bench CAD is nominal 100×140×40.4mm, with user-approved four visible corner screws and unresolved closure. This electrical/software batch did not edit mechanical assets or the enclosure handoff. Use
@enclosure-work-handoff and current Project Specification for mechanical state; no fit-ready, closure-qualified or IP claim.
Research-only alternative — no substitution or purchase
@prototype-materials-and-wiring records two MaxBotix MB7389-100 as an alternative at approximately USD219.90 per pair versus historical SEN0208 USD32, before delivery/tax. Its documented supply range and manufacturer UNO example improve evidence, but numeric DC I/O guarantees remain unresolved. The existing firmware's 45ms wait is incompatible with its delayed pulse output; new scale/sentinel/acquisition firmware and tests plus rig/mount review would be needed. The user has now explicitly retained SEN0208 and prohibited substitution; this alternative is archived research only.
Sourcing blockers first, then physical evidence and next work
First close the engineering sourcing gate: unambiguous manufacturer supply/interface approval or a qualified compatible supply/interface design. Then, with actual hardware and instruments available, qualify rail/current and carry out gated timing/acoustic tests. No actual hardware is known available to verify upload, current demand/USB allowance, echo timing, acoustic cross-talk, accuracy, recovery/endurance. Whole-system power margin remains open. Need received revision confirmation and actual rig survey before calibration. Current sensor specified range begins 30 cm with wide beam: do not assume small tabletop tank suitability. Check actual selected revision documentation and rig geometry. No public-drain obstruction or hazardous-atmosphere deployment. Next safe steps: inventory and basket without purchase, engineering resolution of guaranteed supply/interface ratings, independent UNO-alone dry preparation, then released harness commissioning with supervisor only when actual hardware/instruments exist. Software reproduction is already complete; do not redo it merely to imply progress on the electrical blocker. Do not report prototype as physically working.