I attempted the Q3/QSR1 cleanup in-place: stitched the multi-drain pad groups, removed bad autorouter stubs, ran a cleanup autoroute pass, and reran DRC.
Open items:
  • The board is still not DRC-clean.
  • Remaining: 1 airwire, 5 dangling trace warnings, and 8 overlapping-copper errors.
  • Root cause remains the BSC040N10NS5 footprint model: the drain is represented as multiple separate pads plus exposed copper, and the router still produces invalid copper around that geometry.
Recommended next step: create/import a custom BSC040N10NS5 footprint with a single merged drain copper region, replace Q3/QSR1 with that footprint, then reroute the SR stage.
Yes, create the custom BSC040N10NS5 footprint, replace Q3/QSR1, reroute SR nets, and rerun DRC.
I’ll implement the custom SR footprint behavior in-place by converting Q3/QSR1 to use the large exposed drain pad as the single routable drain connection, removing the problematic split drain pad routes, then rerouting and checking DRC.
Implemented the custom Q3/QSR1 drain treatment and rerouted the affected SR nets.
What changed:
  • Disabled the small duplicate drain pads D_1–D_4 on Q3 and QSR1.
  • Left the large exposed drain pad D_5 active as the single merged drain region.
  • Deleted and rerouted affected SR nets.
  • Re-ran DRC and router preflight.
Result:
  • Q3/QSR1 no longer appear in router preflight warnings.
  • The original Q3/QSR1 multi-drain footprint issue is resolved.
  • Remaining DRC is reduced but not fully clean: 3 airwire trace artifacts, 3 dangling-trace warnings, and 7 overlapping-copper errors remain, now mostly outside the Q3/QSR1 merged-drain issue.
Next best step: clean the remaining non-SR trace/via overlap artifacts, then rerun full DRC and final creepage review.
Clean DRC and review
Fix remaining artifacts
Run final creepage
Check power routing
Update routing notes

PCB Routing Status — 400 Hz Isolated PFC Power Supply
Routing Performed
  • Auto-route was run on the current 180 mm × 120 mm, 4-layer placement.
  • Initial route completed successfully and applied 1089 routing objects.
  • A cleanup routing pass was run after removing specific problem traces.
  • Targeted routing was attempted for remaining affected nets.
Router Notes
Pre-route warnings were primarily expected same-net overlapping pads on multi-pad MOSFET packages:
  • Q2 multi-pad MOSFET group
  • QACF1 multi-pad MOSFET group
  • Q3 drain multi-pad group
  • QSR1 drain multi-pad group
These are typical for high-current FET packages and were treated by the router as single electrical pins.
Current Post-Route Status
The board is partially routed but not release-clean.
Remaining checks after cleanup:
  • Airwire errors remain around Q3 / ACF_SEC_FREEWHEEL multi-drain pad routing.
  • Dangling trace warnings remain on several short route stubs.
  • Overlapping copper errors remain, including around secondary MOSFET/pad areas and several vias/traces.
Cleanup Attempts Already Made
Removed/retried specific problem traces:
  • Trace f973 / 671d class issue around ACF_SEC_FWD / ACF_SEC_FREEWHEEL
  • Trace f57d / 69a1 around PFC_GATE_A_DRV
  • Trace 566e / 7b06 around PFC_HV_BUS_390V
  • Trace dc44 dangling stub
Targeted reroutes attempted:
  • ACF_SEC_FWD: QSR1 drain group to T1 secondary
  • ACF_SEC_FREEWHEEL: Q3 drain group to T1 secondary
  • PFC_GATE_A_DRV: U1 GDA to RG1
  • PFC_HV_BUS_390V: RHV1 to CBULK1
Some targeted traces routed successfully, but checks still report unresolved issues.
  1. Inspect Q3 and QSR1 footprints/pad definitions. The multi-drain pad groups are causing airwire and copper-overlap cleanup issues.
  2. Replace or edit the MOSFET footprints if the drain pad geometry is being represented as overlapping independent pads instead of a valid merged copper region.
  3. Clean dangling trace stubs after footprint/pad cleanup.
  4. Re-route the ACF secondary rectifier nets manually with wide copper pours/polygons instead of narrow traces.
  5. Review all primary-secondary isolation spacing after routing; the present routing is not yet safety-reviewed.
  6. Re-run full DRC after footprint cleanup and manual high-current routing.
Release Status
Do not release this routed PCB for fabrication yet. The schematic and placement are usable, and routing is substantially started, but the PCB requires manual high-current/power-stage routing cleanup and DRC closure.
  • Routing Performed

  • Router Notes

  • Current Post-Route Status

  • Cleanup Attempts Already Made

  • Recommended Next Actions

  • Release Status