Project Start Chat


Created a project doc

Project Specification

View Document

Project Specification Project Overview
  • Status: Engineering prototype / RevB
  • Editable 2-layer carrier PCB for a complete Heltec WiFi LoRa 32 V4.3 (HTIT-WB32LAF, ESP32-S3R2).
  • The Heltec remains a plug-in module; it must not be replaced by a bare ESP32-S3.
Intended Use
SmartHive sensor node for environmental, motion, weight, audio and GNSS sensing, powered by a protected 1S 18650 system with optional solar input. This revision is not fabrication-ready until the listed physical and power questions are closed.
Required Interfaces Fixed peripheral configuration
  • LIS2DW12: CS -> 3V3_A; SDO/SA0 -> GND; INT2 NC; expected address 0x18.
  • HX711: channel A, gain 128, RATE=0/GND, 10 samples/s.
  • INMP441: L/R -> GND, no MCLK; optional 100k SD pull-down, local 100nF, opti...
La especificación oficial ya quedó registrada y el proyecto fue renombrado. Ahora se está construyendo el esquema por bloques, resolviendo componentes y footprints verificables antes de pasar al PCB.
Se avanzó el proyecto SmartHive_Node_RevB_Flux:
  • Se registró la especificación oficial en el archivo Project Specification.
  • Se creó y verificó el esquema por bloques.
  • Se creó la PCB de 2 capas y se realizó el placement funcional.
  • El routing de las conexiones inequívocas quedó en curso.
  • Siguen pendientes la validación final ERC/DRC, el conteo exacto de airwires y la vista final de Bottom Copper.
  • Permanecen abiertos, según especificación: coordenadas P4/P5, tensión V_GPS, selección de potencia solar y OPEN_REQ_BAT_TEMP.
La ejecución se detuvo porque se agotaron tus ACUs.
"SmartHive PCB Design" completed.
El subproceso reportó estado completado, pero no pude acceder ni reconciliar su informe con el proyecto en esta sesión. Por tanto, no puedo confirmar que el routing, ERC/DRC o la vista final de Bottom Copper hayan quedado terminados; esos puntos permanecen pendientes de verificación.
No se aplicaron cambios adicionales. La ejecución se detuvo porque se agotaron tus ACUs.

Waiting for input


Project Specification
Project Overview
  • Status: Engineering prototype / RevB
  • Editable 2-layer carrier PCB for a complete Heltec WiFi LoRa 32 V4.3 (HTIT-WB32LAF, ESP32-S3R2).
  • The Heltec remains a plug-in module; it must not be replaced by a bare ESP32-S3.
Intended Use
SmartHive sensor node for environmental, motion, weight, audio and GNSS sensing, powered by a protected 1S 18650 system with optional solar input. This revision is not fabrication-ready until the listed physical and power questions are closed.
Required Interfaces

Table


FunctionSignals / GPIOPhysical Heltec contact
SHT41 interiorSDA_INT GPIO4; SCL_INT GPIO6JP5.15; JP5.17
SHT41 exteriorSDA_EXT GPIO17; SCL_EXT GPIO18P5.1; P5.2
LIS2DW12SDA_INT, SCL_INT; INT1 GPIO15JP5.15, JP5.17; P4.1
HX711DT GPIO41; SCK GPIO42JP5.8; JP5.7
GPSGPS TX -> GPIO39; GPS RX 3V3_A; SDO/SA0 -> GND; INT2 NC; expected address 0x18.
  • HX711: channel A, gain 128, RATE=0/GND, 10 samples/s.
  • INMP441: L/R -> GND, no MCLK; optional 100k SD pull-down, local 100nF, optional BCLK/WS series resistors.
  • UART GPS lines are intentionally crossed.
Connector Pin Orders
  • J_SHT_INT: 1 3V3_INT_PROT, 2 GND, 3 SDA_INT, 4 SCL_INT
  • J_SHT_EXT: 1 3V3_SW_PROT_EXT, 2 GND, 3 SDA_EXT, 4 SCL_EXT
  • J_HX: 1 3V3_SW_PROT_HX, 2 GND, 3 DT, 4 SCK
  • J_GPS: 1 V_GPS, 2 GND, 3 TX_GPS, 4 RX_GPS
  • J_MIC: 1 3V3_SW_PROT_MIC, 2 GND, 3 BCLK, 4 WS, 5 SD, 6 L/R->GND
  • J_ACC: 1 3V3_A, 2 GND, 3 SDA_INT, 4 SCL_INT, 5 INT1, 6 INT2 NC, 7 CS->3V3_A, 8 SDO/SA0->GND
  • J_LOAD: 1 E+, 2 E-, 3 A+, 4 A-
Bus Architecture
  • I2C0 / Wire: GPIO17 SDA_EXT, GPIO18 SCL_EXT; integrated Heltec OLED plus exterior SHT41.
  • I2C1 / Wire1: GPIO4 SDA_INT, GPIO6 SCL_INT; interior SHT41 plus LIS2DW12.
  • The two buses must never be joined. Both SHT41 devices use address 0x44.
Power Tree and Open Power Requirements
  • 3V3_A: always-active Heltec VDD_3V3; LIS2DW12 and interior-bus infrastructure.
  • 3V3_INT_PROT: independent protected branch for interior SHT41.
  • 3V3_SW: Heltec Vext; separate protected branches 3V3_SW_PROT_EXT, 3V3_SW_PROT_MIC and 3V3_SW_PROT_HX.
  • V_GPS: independent and unresolved; do not tie to 5V, 3.3V or VBAT until HW-248 hardware is verified.
  • Battery path: 1S 18650 -> 1S protection -> fuse -> Heltec JP2, preserving charging through protection.
  • Solar path: 5W/18V nominal panel, Voc ~21.92V -> input/reverse protection -> 5V buck -> OVP -> Heltec JP3.
  • OPEN_REQ_BAT_TEMP: inhibit USB and solar charging outside the battery temperature range; implementation unresolved.
  • PENDING SOLAR POWER COMPONENT SELECTION: architecture only until final parts and power budget are approved.
Heltec Internal Controls and Reservations
  • GPIO36 Vext control, LOW=ON; GPIO34 GPS power, LOW=ON; GPIO37 battery measurement enable, HIGH=enabled; GPIO1 battery ADC.
  • Existing Heltec divider is approximately 390k/100k, nominal factor 4.9; do not add another GPIO1 divider.
  • Do not reuse radio GPIO8-14, 2, 5, 7; USB GPIO19/20; memory GPIO26-32; OLED GPIO21; internal GPIO34-37 and GPIO1; service GPIO43/44.
  • Avoid strap/boot GPIO0, 3, 45 and 46.
PCB Requirements
  • Initial 2-layer rectangular engineering carrier; standard through-hole vias and conservative prototype rules.
  • Heltec is the primary module. Keep USB-C, PRG, RESET and antenna accessible.
  • Functional zones: Heltec/digital, environmental, motion, HX711/load cell, audio, GNSS, battery and solar.
  • HX711 close to J_LOAD; A+/A- short and paired; keep away from switching power, LoRa antenna and I2S clocks.
  • Use substantial bottom-layer routing for suitable low-speed signals while prioritizing return continuity and electrical correctness.
  • Continuous GND return; avoid isolated copper and copper/noisy circuitry in the Heltec antenna region.
Test Points
GND, 3V3_A, 3V3_SW, V_GPS, SDA_INT, SCL_INT, SDA_EXT, SCL_EXT, HX_DT, HX_SCK, GPS_TX, GPS_RX, BCLK, WS, SD and battery/ADC where applicable.
Physical and Electrical Open Items
  • MECHANICAL VERIFICATION REQUIRED: exact Heltec V4.3 P4/P5 coordinates and final module footprint.
  • V_GPS — PENDING HW-248 VERIFICATION.
  • PENDING SOLAR POWER COMPONENT SELECTION.
  • OPEN_REQ_BAT_TEMP.
  • External sensor boards may already contain pull-ups/decoupling; do not populate duplicate optional parts without verification.
Validation and Completion Criteria
  • Editable schematic and PCB in Flux.
  • ERC/DRC executed; critical errors corrected, justified pending warnings retained.
  • Only unequivocal nets routed. Nets depending on P4/P5 mechanics, V_GPS or final solar parts remain explicitly pending.
  • No manufacturing files or fabrication-ready claim for this revision.
Assumptions
  • SMD implementation is acceptable unless a confirmed module/connector footprint dictates otherwise.
  • Board outline may be provisional and intentionally generous for serviceability.
  • Ground is common across logic and sensor domains; protected positive rails remain distinct.
Change Notes
  • RevB textual specification accepted as the official source of truth after PDF extraction failure.
  • Project Overview

  • Intended Use

  • Required Interfaces

  • Fixed peripheral configuration

  • Connector Pin Orders

  • Bus Architecture

  • Power Tree and Open Power Requirements

  • Heltec Internal Controls and Reservations

  • PCB Requirements

  • Test Points

  • Physical and Electrical Open Items

  • Validation and Completion Criteria

  • Assumptions

  • Change Notes