Chat


How can I help you?

Explain project
Write a project description
Find schematic issues

SCK C24 Structural Repair Attempt
Result and scope status
  • Failed: reduce the live PCB from 20 to 19 airwires. The sole HOST_SPI_SCK routing attempt timed out without adding copper; final count is 20.
  • Completed, then reverted: one structural placement candidate, C24 only. No second component or alternate placement was attempted.
  • Completed: check both C24 connections in the same pass; both remained physically connected after moving.
  • Completed: atomic rollback of the entire unsuccessful experiment to checkpoint #26b178b7, followed by fresh routing-state and scoped DRC inspection.
  • Unattempted, by scope: unrelated-net routing, broad cleanup, rule changes, new components, and further structural candidates.
Geometry and exact placement
Live geometry identified C24 as a 0402 VCCAUX decoupler in the specified north-side area. Its original Top-side bounds were approximately x −6.91…−6.11 mm and y 11.62…13.20 mm. Adjacent features include the 3V3 diagonal to the north, the FPGA_CLK_25M routing to the east, and HEARTBEAT routing at x −7.4 mm to the west. The move opened space immediately north of C24 and brought the capacitor closer to the FPGA; the failed route means C24 was not established as the sole routing blocker.

Table


PropertyOriginal/final restoredTemporary experiment
ComponentC24C24
Center X−6.5067 mm−6.5067 mm
Center Y12.4089 mm11.9089 mm
Rotation97°unchanged
SideTopunchanged
Translation—0.5000 mm south
U1, R19, and all other components stayed fixed. The placement tool reported zero overlaps, keepout violations, or out-of-bounds components for the temporary move.
C24 copper and connection reconstruction
Before moving, removed only C24's obsolete upper P1 landing segment to prevent proximity to its shifted ground pad:
autoRouted.auto-layout-9f20bf5b-525a-4fe1-82b6-272d266094c2.2291799c-6068-4dc9-9012-d53a968f2fb1.Trace.23c45ca8e9fca18b5f6c82a14cbe9682
This was a 0.5 mm-wide Top segment from (−6.448202, 11.932478) to (−6.448202, 11.443552) mm. Its lower adjoining segment and the existing 2V5 via were retained.
  • P1 / 2V5: routing call from C24:P1 to retained trace ending 74371716f09fe0fa1d695b06dd5cb3ca, requested width 0.5 mm, returned already-connected, one copper island, no unconnected pairs. The shifted P1 directly reached the retained landing copper, so no new trace was necessary.
  • P2 / GND: routing call from C24:P2 to C23:P2, requested width 0.15 mm, returned already-connected, one copper island, no unconnected pairs. Existing ground copper connectivity remained; no new trace was necessary.
  • Airwire count after each connection check was 20.
Rollback restored both C24's original position and the deleted P1 segment. No schematic wiring changed.
HOST_SPI_SCK attempt
  • Target: 22219245-723a-4eaf-a464-c8359e61f087 → U1:PT56A (approximately −5.4, 5.2 mm).
  • Router reported source landing: trace at (9.250, 8.930) mm.
  • Requested trace width: 0.15 mm.
  • Search limit: 120 seconds, one attempt only.
  • Result: time-limit, two islands remaining, zero connected pairs, one unconnected pair.
  • Added SCK traces/vias: none. Consequently there is no successful route layer/length/via count to report.
Verification and preservation
Atomic revert returned success and undid exactly the two mutation commits: the C24 movement and its P1 segment deletion. Fresh scene-tree inspection confirmed C24 restored to (−6.5067, 12.4089) mm, Top, 97°.
Fresh routing-state inspection confirmed 20 airwires, including the unchanged HOST_SPI_SCK target, and the baseline 90 redundant traces in 29 groups. Existing unrelated routing and protected USB copper were untouched; no broad redundant-copper cleanup was performed.
Final DRC query reviewed at 2026-09-18T16:49:35.403Z, requesting airwires, overlapping copper, overlapping traces, invalid layers, under-connected vias, protected intrusions, component-body overlaps, and keepouts. It returned only the 20 airwire Errors, with no other findings in those requested checks. This is not a claim that the overall board is complete or manufacturing-ready.
Preflight also reported an existing Warning that the 2V5 width exceeds U1:VCCAUX_F15 pad size, and an Info via-at-SMD advisory for EP. Those were outside this repair's scope and were not changed.
The bounded experiment is finished; the requested 19-airwire goal remains unmet. No further routing or placement retries were made.
  • Result and scope status

  • Geometry and exact placement

  • C24 copper and connection reconstruction

  • HOST_SPI_SCK attempt

  • Verification and preservation