Project Execution Plan


  • Connected J_HDMI:TMDS Data 2+, R9:P2, R9:P1, U2:TX2+, U7:IO1
  • Connected J_HDMI:TMDS Data 2-, R10:P2, R10:P1, U2:TX2-, U7:IO2
  • Connected J_HDMI:TMDS Data 1+, R11:P2, R11:P1, U2:TX1+, U7:IO3
  • Connected J_HDMI:TMDS Data 1-, R12:P2, R12:P1, U2:TX1-, U7:IO4
  • Connected U7:G, U7:G, GND:GND

Worked

Work completed
  • TMDS termination resistors and TVS diodes added to the HDMI connector
  • HDMI TMDS nets routed to the ADV7513 transmitter
Remaining tasks
  • Add and configure ESD protection diodes for USB data lines and wire D+/D- to the USB bridge
  • Implement reverse-polarity protection and input capacitors on the power jack and connect to the buck regulator’s VIN
  • Hook up the programming header to the ESP32’s debug/program pins
  • Add and connect supporting passives (inductor, caps, feedback resistors) for the buck converter and LDO
  • Tie all main IC power pins (ESP32, ADV7513, FT232RL, flash) to 3.3 V/GND and route communication interfaces (UART, SPI, I²S, audio, buttons, LEDs)
  • Terminate any unused GPIOs with pull-ups or pull-downs as appropriate
  • Run ERC and resolve any electrical-rule violations
Success criteria status
  • Schematic is not yet fully complete; interfaces and protection remain unfinished
  • ERC has not been run—errors may still exist
  • PCB layout has not been started
  • BOM review and manufacturing files export pending
Recommended next step
Continue with step 1.3: add ESD protection to the USB data lines and connect the USB connector to the FT232RL.

Flux stopped


Schematic of Awful Blush Transporter
U5
U1
J_USB
U3
U4
End of Life
Schematic Not Placed

The schematic has not been placed. Flux can arrange symbols and draw wires to be more readable. This takes about 10–60 mins.

Awful Blush Transporter