Project Start


Created a thread, a project
Cylinder LED Carrier
Passive three-channel LED carrier prototype for the Cylinder LED Controller: 35 ×120 mm target, six separate conductors to external 675–680 nm LED stars, downward optics and separate metal heat spreader in a 50 mm bore model-aircraft housing. Mechanical and daylight-visibility validation pending.
Build three-LED carrier PCB
Starting...
View Thread
I’ve created the separate LED-carrier project and settled on a compact medium-beam lens candidate. I also found that the controller’s generic inductor footprints weren’t suitable for the power stages, so I’m replacing them with real power-inductor packages before placement.
Thought for 1 min 52 sec
Thought for 8 sec
Awaiting 1 task
"Cylinder LED Controller" completed.
I updated the prototype floorplan for your 50 mm-diameter × 127 mm-long cylinder and created the separate LED-carrier project.
  • Controller: the existing 47-component schematic remains the starting point. I identified unsuitable generic power-inductor footprints and started correcting them, but couldn’t verify the saved result.
  • LED carrier: I started its schematic and placement build; no completed result was available before execution stopped.
  • Optics: the provisional candidate is Carclo 10195, approximately 20 mm diameter × 9.9 mm high. Compatibility with your exact LEDs and daylight visibility at 150 ft remain unverified.
Neither PCB is confirmed placed, routed, or manufacturing-ready. Next work is to finish the inductor corrections, complete both placements, and check battery clearance and the separate metal LED heat-spreader arrangement before routing.
Execution stopped because your ACUs ran out.
"PCB Carrier Build" completed.
The LED-carrier build has now reported completion, but I couldn’t inspect its saved result, so I’m not yet confirming it as verified or manufacturing-ready. No additional project changes were made this turn.
Remaining work is to review the LED carrier, confirm the controller’s inductor corrections, and check battery, lens, and heatsink clearance before finishing layout and routing.
Execution stopped because your ACUs ran out.

Power Budget
Loads
  • LEDs upper electrical estimate: 3 x 0.7 A x 2.6 V = 5.46 W.
  • At assumed 85% LED-converter efficiency: 6.424 W input.
  • At 9.3 V minimum allowed pack voltage: 0.691 A LED input.
  • ESP32-C3 radio peak: 345 mA at 3.3 V = 1.139 W. Assuming 85% 3.3 V buck efficiency gives 0.144 A at 9.3 V.
  • Worst-case coincident source current before small quiescent loads: 0.835 A; design allowance rounded to 0.85 A.
  • Non-RF active reference: 28 mA at 3.3 V gives about 11.7 mA from 9.3 V at 85% efficiency.
150-Second Energy
LED energy at the stated upper estimate is 5.46 W x 150/3600 h = 0.2275 Wh. At 85% assumed conversion efficiency this is 0.2676 Wh from the pack before MCU and regulator losses. This is an estimate, not a fixed runtime claim.
Sizing Rationale
  • 2 A fuse is over 2.3x the 0.85 A calculated coincident current allowance.
  • XT30 input is rated far above expected current.
  • TPS563201 is rated 3 A versus 345 mA ESP32 radio peak.
  • AL8860 sense is 0.15 ohm: 0.1/R = 0.667 A nominal. This leaves 33 mA below the seller-stated 700 mA LED point to reduce overdrive risk from tolerance and ripple.
  • 47 uH inductors are within the AL8860 33–100 uH guidance; specified 1.2 A continuous and 1.5 A saturation targets exceed nominal channel current.
  • 40 V, 2 A Schottky diodes provide voltage/current margin for a 12.6 V pack.
  • Each CTRL input has a 4.7 kΩ default-off pull-down. MCU high-state resistor load is 3.3 V / 4.7 kΩ = 0.70 mA per active channel.
  • AO3400 is rated ±12 V VGS while LTC4365 gate drive can approach roughly 9.8 V maximum in its specified operating condition and about 11.5 V on a typical startup curve. A 10 V BZT52C10 clamp was therefore added from common gate to common source to restore gate-oxide margin; clamp voltage must be measured at bring-up.
Battery Caveat
The 300 mAh candidate is an envelope example only. Pack capacity, age, C-rating validity, cutoff behavior, temperature, and converter efficiency must be measured before runtime is stated.