CM5 Carrier PCB


I’m checking what was actually committed and locating the earlier build context so I can resume without duplicating or overwriting work.
The schematic is visible but still appears spatially scattered; I’m reading the actual pin/net state rather than relying on the image alone.
The live state is confirmed: 27 primary components, zero nets, and the earlier attempt stopped before any wiring. I’ve resumed the existing build context with the complete requirements; the next committed changes should be the power-path support circuitry and named nets.
Thought for 5 mins 42 sec
Awaiting 1 background task
"CM5 Handheld Schematic" completed.
The resumed build added three generic support parts, bringing the project from 27 to 30 components, but it still has 0 nets. No functional block is connected, ERC has not been run, and the schematic-completion checkpoint has not been reached.
Remaining work:
  • Finish the power budget and power-path support circuits
  • Wire USB-C PD, internal DC input, 5 V/3.3 V rails, and CM5 power
  • Wire USB hub, USB-A ports, DSI, and touch interfaces
  • Add remaining required passives and mark unused pins
  • Run ERC and correct real violations
  • Reconcile PCB placement only after the schematic netlist is valid
Execution stopped because your ACUs ran out.

Waiting for input


Power Budget
Provisional 5 V Load Budget

Table


LoadTypical allowancePeak allowance
CM53.0 A5.0 A
Display and touch1.0 A2.0 A
Two USB-A ports combined1.0 A3.0 A
Hub and board overhead0.2 A0.5 A
Total5.2 A / 26 W10.5 A / 52.5 W
Design Target
The main regulator is provisionally sized for 5 V / 8 A continuous (40 W). The 10.5 A arithmetic peak is not permitted continuously: the two external USB-A branches are limited to approximately 1.5 A each and the internal touch branch to approximately 0.5 A; software/hardware load shedding remains required if CM5 and display peaks overlap with maximum peripheral loading.
Source Current
Assuming 92% conversion efficiency:
  • 40 W output requires about 2.17 A at 20 V, 2.90 A at 15 V, or 3.62 A at 12 V.
  • 52.5 W arithmetic peak requires about 2.85 A at 20 V, 3.80 A at 15 V, or 4.76 A at 12 V.
  • A 20 V / 3.25 A (65 W) PD contract has adequate power margin for the 8 A continuous target, but not unlimited margin for the full 10.5 A peak plus losses.
Path Sizing Conclusion
  • USB-C receptacle and PD cable must support the negotiated contract; a 3.25 A contract does not require a 5 A e-marked cable, although the receptacle path is provisionally rated for 5 A collective VBUS.
  • The alternate DC connector and protection path must carry at least 3.62 A continuously at the 12 V lower bound, with transient margin.
  • The selected 40 V MOSFETs are acceptable only for a well-clamped 20 V-class input. They do not provide comfortable uncontrolled surge margin; TVS/clamp selection and layout are production blockers.
  • The existing 4.7 uH inductor is not the value used by the LM5148 5 V / 8 A high-frequency reference example. The rough schematic retains it as provisional pending loop/ripple redesign; the power stage must not be considered production-validated.
  • Thermal performance of the buck MOSFETs, inductor, current shunt, connector contacts, and PCB copper must be validated in layout and hardware testing.
  • Provisional 5 V Load Budget

  • Design Target

  • Source Current

  • Path Sizing Conclusion