PCB Placement Cleanup


Final routing-readiness placement pass — full placement permission
The user explicitly authorizes moving any components needed to proceed to routing. Mutate placement only; do not route.
Required outcomes
  1. Rebuild the USB corridor so the deterministic USB-C breakout can succeed:
    • Keep J1 at the bottom edge.
    • Clear an unobstructed 3–5 mm inward corridor from J1 D+/D− pads.
    • Place U10 close to the end of that corridor, oriented flow-through.
    • Place R32/R33 immediately MCU-side of U10.
    • Move R18/R19, F1, D1, and other USB power/CC parts laterally out of the data-pair corridor while retaining short power/protection paths.
  2. Eliminate the remaining U5/C2/C25 switching-stage finding. You may move the complete U5/L1/C1/C2/C25 cluster and nearby passives.
  3. Reorganize any other clusters necessary for routing corridors, while preserving:
    • J1 bottom edge, MK1 top acoustic edge;
    • separate U1 BLE and AE1 Wi-Fi antenna perimeter sectors and keepouts;
    • J2/J3 service access and rear battery projection.
  4. Finish with zero body overlaps, zero out-of-bounds, zero edge/keepout violations, and zero switching-power-stage errors.
  5. Run routing preflight. The MK1 same-net overlapping GND-pad advisory and U2 VSS_2 via-at-SMD info may remain if no real footprint defect is present.
Stop condition
Make mutations immediately and settle after one full correction pass plus at most two targeted convergence passes. Report exact coordinates for J1/U10/R32/R33 and any remaining blockers. Do not route.
I’ll rebuild the USB/data corridor and power cluster in one deterministic pass, then use at most two targeted overlap/power-stage convergence passes before the final placement checks and routing preflight. No copper will be added.
The USB corridor is now structured correctly. I’m using the first convergence pass to pull the aligned output-cap bank below U5/L1, clearing LX2 and the remaining body conflicts without touching anchors or RF.
Completed one full correction pass plus two targeted convergence passes. The USB data corridor is cleared and all switching-power-stage findings are zero; no routing was performed.
Key coordinates
  • J1: (0, −24.65 mm)
  • U10: (0, −16.00 mm), 270°
  • R32: (−0.95, −12.80 mm), 90°
  • R33: (+0.95, −12.80 mm), 90°
Remaining blockers
  • C2 ↔ U4 overlap: <0.01 mm²
  • C5 ↔ U4 overlap: 0.39 mm²
  • R18 ↔ U4 overlap: 0.12 mm²
  • R18 pad-access warning
  • Preflight: C5/U4 overlapping pins on different nets
  • Preflight: C2/U4 overlapping same-net GND pins
  • Allowed advisories remain: MK1 same-net GND-pad overlap and U2 VSS_2 via-at-SMD
No out-of-bounds, edge, keepout, or switching-stage violations remain. Routing is still blocked by the U4 local overlaps.

Last modified 1mo ago

Regulatory Compliance Checklist
Wireless
  • Use the certified Raytac module exactly within its antenna keepout and host-integration conditions.
  • Confirm module certification IDs/regions and whether host-product labeling is required.
  • Perform final-product RF exposure and unintentional-radiator review; module certification does not automatically certify the whole pendant.
  • Obtain Raytac layout review before fabrication.
EMC/ESD
  • Verify USB ESD performance, enclosure discharge paths, and cable emissions.
  • Route USB as a controlled 90 Ω differential pair with continuous ground reference.
  • Test radiated/conducted emissions with recording, USB, charging, BLE, NAND writes, and LED PWM active.
Battery and Charging
  • Use a protected, qualified LiPo cell with documented capacity, maximum charge current, thickness, and transport certification.
  • Validate charger temperature monitoring with TH1 physically coupled to the cell.
  • Review IEC/UL requirements applicable to the final consumer wearable and charger use case.
Product/Privacy
  • Provide clear recording indication and lawful-use documentation.
  • Document data retention, USB export, deletion, and BLE security behavior.
  • Secure DFU, disable debug in production as appropriate, and protect stored recordings from unauthorized access.
Materials and Manufacturing
  • Confirm RoHS/REACH declarations, battery shipping documentation, USB-C mechanical compliance, and enclosure skin-contact material suitability.
  • Wireless

  • EMC/ESD

  • Battery and Charging

  • Product/Privacy

  • Materials and Manufacturing