PCB Placement Cleanup


Final routing-readiness placement pass — full placement permission
The user explicitly authorizes moving any components needed to proceed to routing. Mutate placement only; do not route.
Required outcomes
  1. Rebuild the USB corridor so the deterministic USB-C breakout can succeed:
    • Keep J1 at the bottom edge.
    • Clear an unobstructed 3–5 mm inward corridor from J1 D+/D− pads.
    • Place U10 close to the end of that corridor, oriented flow-through.
    • Place R32/R33 immediately MCU-side of U10.
    • Move R18/R19, F1, D1, and other USB power/CC parts laterally out of the data-pair corridor while retaining short power/protection paths.
  2. Eliminate the remaining U5/C2/C25 switching-stage finding. You may move the complete U5/L1/C1/C2/C25 cluster and nearby passives.
  3. Reorganize any other clusters necessary for routing corridors, while preserving:
    • J1 bottom edge, MK1 top acoustic edge;
    • separate U1 BLE and AE1 Wi-Fi antenna perimeter sectors and keepouts;
    • J2/J3 service access and rear battery projection.
  4. Finish with zero body overlaps, zero out-of-bounds, zero edge/keepout violations, and zero switching-power-stage errors.
  5. Run routing preflight. The MK1 same-net overlapping GND-pad advisory and U2 VSS_2 via-at-SMD info may remain if no real footprint defect is present.
Stop condition
Make mutations immediately and settle after one full correction pass plus at most two targeted convergence passes. Report exact coordinates for J1/U10/R32/R33 and any remaining blockers. Do not route.
I’ll rebuild the USB/data corridor and power cluster in one deterministic pass, then use at most two targeted overlap/power-stage convergence passes before the final placement checks and routing preflight. No copper will be added.
The USB corridor is now structured correctly. I’m using the first convergence pass to pull the aligned output-cap bank below U5/L1, clearing LX2 and the remaining body conflicts without touching anchors or RF.
Completed one full correction pass plus two targeted convergence passes. The USB data corridor is cleared and all switching-power-stage findings are zero; no routing was performed.
Key coordinates
  • J1: (0, −24.65 mm)
  • U10: (0, −16.00 mm), 270°
  • R32: (−0.95, −12.80 mm), 90°
  • R33: (+0.95, −12.80 mm), 90°
Remaining blockers
  • C2 ↔ U4 overlap: <0.01 mm²
  • C5 ↔ U4 overlap: 0.39 mm²
  • R18 ↔ U4 overlap: 0.12 mm²
  • R18 pad-access warning
  • Preflight: C5/U4 overlapping pins on different nets
  • Preflight: C2/U4 overlapping same-net GND pins
  • Allowed advisories remain: MK1 same-net GND-pad overlap and U2 VSS_2 via-at-SMD
No out-of-bounds, edge, keepout, or switching-stage violations remain. Routing is still blocked by the U4 local overlaps.

Project Specification
Project Overview
Status: Architecture review — revised requirements accepted; schematic rework is gated on confirmation of the Wi-Fi duty cycle and mechanical package.
Circular wearable voice recorder that continuously captures high-quality speech audio, maintains a rolling encoded pre-roll buffer, stores timestamped Opus recordings, and transfers recordings over USB-C or wireless links.
Intended Use
  • Pendant/wearable prototype for personal voice-note capture.
  • Continuous recording capability for at least 72 hours is the design target.
  • USB-C provides charging, USB 2.0 data export, and firmware update.
  • BLE supports low-power control and synchronization; Wi-Fi is required for higher-speed synchronization.
  • Recording state must be unambiguous and lawful/consensual use must be documented.
What the Device Should Do
  • Continuously sample the microphone while maintaining a configurable encoded pre-roll buffer.
  • Start/stop and mark recordings with the multifunction button.
  • Store at least 72 hours of timestamped audio at the selected production bitrate.
  • Export recordings over USB-C and synchronize over Wi-Fi.
  • Preserve time while the battery remains connected and acquire wall time from USB/BLE/Wi-Fi after reset.
  • Indicate charging, recording, low battery, synchronization, and fault states with a programmable RGB LED.
Main Features
  • Preferred compute: Nordic nRF5340, selected for dual-core processing and increased RAM.
  • Wi-Fi companion: Nordic nRF7002-class device, independently power-gated and used primarily for explicit/burst synchronization.
  • BLE remains available through the nRF5340.
  • High-quality digital MEMS microphone near the upper board edge, aimed toward the wearer through a sealed acoustic channel.
  • Mono is the production default; stereo remains an optional variant because it increases storage, encoding load, acoustic complexity, and power.
  • At least 2 GB usable nonvolatile audio storage for robust 72-hour mono recording; 4 GB target if stereo is selected.
  • USB-C sink/device interface for charging, USB data, and DFU.
  • Protected 1S Li-polymer battery, fuel gauge, charge power path, and pack temperature sensing.
System Architecture

Text


Protected 1S LiPo ─┬─ Charger / power path ─ system rail ─ efficient regulated rails
USB-C VBUS ─ protect┘                                  ├─ nRF5340 + storage
                                                       ├─ digital MEMS microphone(s)
                                                       └─ switched nRF7002 Wi-Fi rail

USB-C D+/D− ─ USB ESD / series damping ─ nRF5340 USB
Microphone PDM ─ nRF5340 audio capture / Opus encode
nRF5340 QSPI/SPI ─ 2–4 GB managed NAND/NOR storage
nRF5340 high-speed host interface ─ nRF7002 Wi-Fi
nRF5340 I²C ─ fuel gauge / power monitoring
Hardware Subsystems
Compute and RF
  • Use nRF5340 unless sourcing or implementation evidence forces a change.
  • nRF5340 has BLE/802.15.4 but does not contain Wi-Fi; Wi-Fi therefore requires a separate companion radio.
  • The Wi-Fi rail must be load-switched so recording power does not include Wi-Fi standby leakage.
  • BLE and Wi-Fi antennas require separate perimeter sectors, verified keepouts, and coexistence planning.
  • Prefer bare ICs for production density; certified-module variants may be considered for an EVT spin if they fit the mechanical envelope.
Audio
  • Acoustic activity detection is not a design requirement because the microphone must remain active for pre-roll.
  • Preferred baseline microphone is a high-SNR bottom-port digital PDM device in the T5838/IM69D128 class, subject to live JLCPCB or PCBWay procurement verification when the BOM is frozen.
  • Place the microphone near the top of the board. The enclosure opening/channel must face toward the wearer, use an acoustic mesh, and seal to the PCB port with a gasket.
  • Production default: mono Opus at 24–32 kbps. Optional stereo uses two matched microphones with matched acoustic channels.
Storage
  • Existing 256 MB raw capacity is inadequate for 72 hours.
  • Mono storage target: at least 2 GB usable after bad-block, filesystem, metadata, and recovery reserve.
  • Stereo storage target: at least 4 GB usable.
  • Storage firmware must enable internal ECC where applicable, preserve factory bad-block data, maintain a bad-block table, and use power-fail-safe append/commit metadata.
USB
  • Preserve USB-C charging and USB 2.0 device data transfer.
  • Device/sink only; no USB-PD is required unless charging-time requirements later demand it.
  • USB functions include read-only/snapshot audio export and signed DFU.
  • Maintain CC pull-downs, VBUS protection, low-capacitance D+/D− ESD, local VBUS capacitance, and controlled-impedance differential routing.
Power
  • Protected 1S Li-polymer cell with pack NTC is required.
  • Target cell class: approximately 800–1050 mAh for the first mechanical study.
  • The 72-hour target requires measured battery current of approximately 9–11 mA or less for comfortable margin with this cell class.
  • Wi-Fi must normally remain off during continuous recording and should preferentially synchronize while connected to USB power.
  • Initial charge-current target is approximately 400 mA; 500 mA is allowed only after enclosure thermal validation.
Interfaces and Connections
  • USB-C: VBUS, D+, D−, CC1, CC2, shield/GND.
  • Battery: protected 1S cell, BAT+, GND, cell-bonded NTC.
  • Debug: SWDIO, SWDCLK, nRESET, power, and ground through a compact production connector/pads.
  • Audio: one PDM channel baseline; optional dual-microphone stereo sharing the PDM clock/data strategy supported by the chosen parts.
  • Storage: QSPI/SPI with independent chip select(s) as required.
  • Wi-Fi: high-speed host interface, coexistence/control signals, switched supply, and separate antenna.
Power and Runtime Expectations
  • Continuous recording target: at least 72 hours.
  • Recording-mode design target: ≤9–11 mA at the battery for mono, radios normally off.
  • Stretch target: ≤8 mA through fixed-point codec optimization and buffered flash writes.
  • BLE may advertise at low duty cycle.
  • Continuous Wi-Fi during the 72-hour interval is infeasible within the size/thickness constraint.
  • Wi-Fi synchronization is burst-based, preferably after recording or while USB powered.
Power Tree and Power Budget

Table


Mode/loadDesign target
Mono recording, radios off7–10 mA battery current
Stereo recording, radios off8–12 mA battery current
BLE occasional activity+0.1–0.8 mA average
Wi-Fi burst synchronizationhigh transient current; scheduled and power-gated
Battery capacity target800–1050 mAh initial mechanical study
Required runtime gatemeasured ≥72 h with production firmware and cell
Manufacturing and Assembly Expectations
  • Every production BOM item must be procurable for turnkey assembly through JLCPCB/LCSC or PCBWay at BOM-freeze time.
  • Live stock is a release gate, not a permanent part property; record approved alternates for supply-sensitive parts.
  • Prefer parts with JLCPCB assembly records and PCBWay/authorized-distributor procurement paths.
  • Generic passives require explicit production MPNs before release.
  • Use a minimum four-layer controlled-impedance PCB; six layers may be required after nRF5340/nRF7002 escape and RF review.
  • Avoid exotic HDI unless density proves it necessary and both target assemblers can support the selected stackup.
Firmware-Relevant Hardware Requirements
  • Nordic nRF Connect SDK/Zephyr baseline.
  • Fixed-point or otherwise power-optimized Opus pipeline; encoded pre-roll only, never long raw-PCM buffering.
  • USB and Wi-Fi export must not expose the live recorder filesystem read/write concurrently.
  • Wi-Fi scheduling must avoid audio dropouts and default to off during normal recording.
  • Initial bootloader image is programmed through SWD; later updates may use USB and authenticated wireless DFU.
Physical Design Expectations
  • Finished product shell: circular, ideally ≤55 mm diameter and ≤12 mm total thickness.
  • PCB diameter is provisional and must be derived around the selected battery, antenna sectors, USB-C insertion geometry, microphone channel, and component height map.
  • Expected battery class: round or near-square protected pouch approximately 40–45 mm across and 4.5–6.5 mm thick.
  • Do not compress the pouch; reserve swelling and assembly clearance.
  • USB-C must remain accessible at the perimeter.
  • Microphone port is located near the top and aimed toward the wearer.
  • Battery foil, metal hardware, and enclosure metal must remain outside both RF antenna keepouts.
Important Design Decisions
  • Prefer nRF5340 for RAM/compute and BLE.
  • Add nRF7002-class Wi-Fi rather than assuming nRF5340 includes Wi-Fi.
  • Power-gate Wi-Fi and use burst synchronization; continuous Wi-Fi is outside the 72-hour target.
  • Remove AAD-specific hardware unless the selected microphone requires those pins for another function.
  • Default to one high-quality microphone; treat stereo as a variant, not the baseline.
  • Increase storage from 256 MB raw to at least 2 GB usable.
  • Expand the package from the prior sub-35 mm concept to a shell up to 55 mm diameter and 12 mm thickness to make the runtime target plausible.
Assumptions
  • Wi-Fi is important for synchronization, but does not need to remain continuously connected during recording.
  • Mono 24–32 kbps Opus is acceptable unless the user explicitly selects stereo.
  • A protected 800–1050 mAh battery can be sourced or customized to fit the approved mechanical stack.
  • Final runtime, RF performance, audio quality, charging thermals, and storage reliability must be measured on EVT hardware.
Confirmed Baseline for Schematic Rework
  • Wi-Fi uses burst synchronization and remains off during ordinary recording.
  • Mono high-quality PDM audio is the production baseline; stereo is deferred as an optional variant.
  • Proceed with an 800–1050 mAh protected pouch-cell study inside a ≤55 mm diameter, ≤12 mm shell.
  • Use a six-layer PCB as the planning baseline. Avoid laser microvias/HDI if possible; standard through-vias and deterministic fine-pitch neckdowns are preferred.
  • Treat via-in-pad, blind vias, or microvias as an explicit escalation requiring user approval if package escape or placement proves standard construction infeasible.
Change Notes
  • User approved the burst-Wi-Fi, mono-audio, and provisional 800–1050 mAh mechanical baseline for schematic rework.
  • Replaced the nRF52840-only direction with preferred nRF5340 plus a separate Wi-Fi companion.
  • Added strict JLCPCB/PCBWay assembly sourcing requirements.
  • Removed acoustic-activity-detection as a product requirement.
  • Added top-edge wearer-facing microphone placement and optional stereo consideration.
  • Raised continuous-recording target to 72 hours and battery class to 800–1050 mAh provisional.
  • Increased shell allowance to ≤55 mm diameter and ≤12 mm total thickness.
  • Preserved USB-C charging, USB data, and DFU.
  • Raised storage target to at least 2 GB usable for mono.
  • Project Overview

  • Intended Use

  • What the Device Should Do

  • Main Features

  • System Architecture

  • Hardware Subsystems

  • Compute and RF

  • Audio

  • Storage

  • USB

  • Power

  • Interfaces and Connections

  • Power and Runtime Expectations

  • Power Tree and Power Budget

  • Manufacturing and Assembly Expectations

  • Firmware-Relevant Hardware Requirements

  • Physical Design Expectations

  • Important Design Decisions

  • Assumptions

  • Confirmed Baseline for Schematic Rework

  • Change Notes