PCB Placement Cleanup


Final routing-readiness placement pass — full placement permission
The user explicitly authorizes moving any components needed to proceed to routing. Mutate placement only; do not route.
Required outcomes
  1. Rebuild the USB corridor so the deterministic USB-C breakout can succeed:
    • Keep J1 at the bottom edge.
    • Clear an unobstructed 3–5 mm inward corridor from J1 D+/D− pads.
    • Place U10 close to the end of that corridor, oriented flow-through.
    • Place R32/R33 immediately MCU-side of U10.
    • Move R18/R19, F1, D1, and other USB power/CC parts laterally out of the data-pair corridor while retaining short power/protection paths.
  2. Eliminate the remaining U5/C2/C25 switching-stage finding. You may move the complete U5/L1/C1/C2/C25 cluster and nearby passives.
  3. Reorganize any other clusters necessary for routing corridors, while preserving:
    • J1 bottom edge, MK1 top acoustic edge;
    • separate U1 BLE and AE1 Wi-Fi antenna perimeter sectors and keepouts;
    • J2/J3 service access and rear battery projection.
  4. Finish with zero body overlaps, zero out-of-bounds, zero edge/keepout violations, and zero switching-power-stage errors.
  5. Run routing preflight. The MK1 same-net overlapping GND-pad advisory and U2 VSS_2 via-at-SMD info may remain if no real footprint defect is present.
Stop condition
Make mutations immediately and settle after one full correction pass plus at most two targeted convergence passes. Report exact coordinates for J1/U10/R32/R33 and any remaining blockers. Do not route.
I’ll rebuild the USB/data corridor and power cluster in one deterministic pass, then use at most two targeted overlap/power-stage convergence passes before the final placement checks and routing preflight. No copper will be added.
The USB corridor is now structured correctly. I’m using the first convergence pass to pull the aligned output-cap bank below U5/L1, clearing LX2 and the remaining body conflicts without touching anchors or RF.
Completed one full correction pass plus two targeted convergence passes. The USB data corridor is cleared and all switching-power-stage findings are zero; no routing was performed.
Key coordinates
  • J1: (0, −24.65 mm)
  • U10: (0, −16.00 mm), 270°
  • R32: (−0.95, −12.80 mm), 90°
  • R33: (+0.95, −12.80 mm), 90°
Remaining blockers
  • C2 ↔ U4 overlap: <0.01 mm²
  • C5 ↔ U4 overlap: 0.39 mm²
  • R18 ↔ U4 overlap: 0.12 mm²
  • R18 pad-access warning
  • Preflight: C5/U4 overlapping pins on different nets
  • Preflight: C2/U4 overlapping same-net GND pins
  • Allowed advisories remain: MK1 same-net GND-pad overlap and U2 VSS_2 via-at-SMD
No out-of-bounds, edge, keepout, or switching-stage violations remain. Routing is still blocked by the U4 local overlaps.

Placement Checkpoint
Targeted correction pass — 2026-09-21, final check 21:43:50 UTC
This section supersedes the findings below. The pass is finished but the placement release gate is NOT complete. Only component placement was mutated. No traces, vias, schematic connectivity, board dimensions, stackup, manufacturing rules or antenna geometry were changed. Board remains 55 mm circular, six copper layers, 89 components / 83 nets.
Requested-item status

Table


ItemStatusCurrent evidence / blocker
L2 pad facing U2 and BUCKOUT escapeCompletedL2 is now (7.6,14.8) mm at 180°. Pad 1 faces right toward fixed U2.BUCKOUT. Both U2/L2 errors and the prior switch-path advisory cleared.
C25 beside U5/C2 with a clean output bankFailed / partially improvedC25 moved from storage to the output bank. Four original C25/bank findings reduced to two remaining errors, quoted below. Rotation trials created competing escape/return constraints. C2 was restored exactly to its starting placement, and all introduced overlaps/shorts were cleared. Further local trial-and-error stopped rather than claiming convergence.
C31 pad accessCompleted0.30 mm +Y displacement, unchanged rotation. No final pad-access warning.
C3, C7, C16, C28 decouplingCompletedAll four original decoupling-loop warnings cleared. Fixed ICs and mechanical/RF anchors were not moved.
Wi-Fi top exclusion and inner/bottom no-ground geometryFailed / blocked by unverified datum and exception geometryInspected existing AE1-owned reservation, but did not invent a top exclusion or remove required antenna/feed copper. Canonical datasheet query failed with evidence_location_invalid; alternate source indexing returned evidence_pending after 300 s. Top exception boundary and reference-pattern mapping remain unresolved. Existing inner/bottom reservation is preserved, not certified.
BL5340 all-layer reservation at 135°Completed: orientation/preservation check; exact manufacturer conformity unresolvedNative readback confirms U1 at (-13.4,13.4) mm / 135° and its two active child zones following that rotation, connectedLayers=All. Existing local geometry was preserved under the requested no-guess fallback; independent validation of its drawing-to-footprint datum remains open.
Rear 40–45 mm battery projection and J1/J2/J3 service accessCompleted as preservation, not mechanical certificationNo Bottom parts added or moved; connector positions and all anchors unchanged. No new feature was placed in connector service space. Existing cell-foil, height, lead-protrusion and harness uncertainties remain; the current design never had a verified 3D battery exclusion.
Zero overlap/out-of-bounds/edge/keepout findingsCompletedFinal selected checks returned no findings, including clearance-only body overlaps and overlapping copper.
Zero switching-stage errorsFailedTwo C25 output-bank errors remain; no U2/L2 finding remains.
Routing preflight onlyCompletedRead-only preflight executed; exact warning/info below. No routing was attempted.
Routing, via insertion, schematic editsUnattemptedExplicitly excluded from this pass.
Final coordinates and rotations
Board-centered millimeters; rotations counterclockwise; every listed component remains Top. These are exact persisted values, not the placement tool's rounded summary.

Table


RefStart XStart YStart rotationFinal XFinal YFinal rotation
L27.814.590°7.614.8180°
C25-13.5-6.50°-13.5-12.00°
C3114.517.0180°14.517.3180°
C3-11.0-21.00°-12.5-17.7180°
C7-5.5-4.80°-8.35-6.60°
C168.60.50°8.12.090°
C28-15.8-4.00°-15.15-3.290°
C2 (trial, then restored)-11.0-12.70°-11.0-12.70°
U1, U2, AE1, U3/U8/U9, U4/U5, J1/J2/J3, MK1, SW1 and LED1 were confirmed unchanged by final native readback. U1 and AE1 retain their pre-existing exact X/Y overrides; these supersede their older composite position strings.
Live verification sequence
  • Baseline 21:30:12.313Z: six switching-stage Errors, one switching-stage Warning, C31 pad-access Warning, four decoupling-loop Warnings. No selected geometric violations.
  • Switching-stage fixes were independently rechecked at 21:31:34.912Z, 21:32:10.851Z, 21:33:00.866Z and 21:34:25.901Z. The L2 correction immediately cleared its findings. C25 trials traded output-bank return orientation against LX2/VOUT escape and bank alignment. Last collision-free result retained two C25 errors, so that local convergence loop was stopped.
  • C31/decoupling pass was rechecked at 21:34:59.348Z and 21:35:49.116Z; introduced C1/C7 and SW1/C28 conflicts were corrected without moving anchors. After the last C28 rotation/move, the 21:36:28.703Z check returned no pad-access, decoupling, overlap, edge, boundary or keepout findings.
  • Antenna reservations were then inspected read-only and left unchanged because the exact Wi-Fi top exception geometry was not verified.
  • Final live DRC at 2026-09-21T21:43:50.562Z returned two Errors, zero Warnings across the requested power/placement/geometric checks. No findings were returned for pad access, decoupling loop, body overlap, board boundary, edge placement, keepout, copper overlap, invalid layer, stackup validation or protected intrusions. Airwires are intentionally not a completion gate in this unrouted placement-only pass.
Exact remaining switching-stage errors
  1. Error: “C25 (output bank, rank 1) hot loop 6.6 mm vs floor 3.7 mm (×1.80, limit ×1.75): 2.9 mm of air beyond touching. Largest gap U5.GND → C25.P2 2.3 mm (floor 0.8). Close the gaps: power pad next to U5.VOUT, GND pad next to U5.GND.”
  2. Error: “C2.P1 → C25.P1: 3V3 route 3.6 mm for 2.1 mm air (detour ×1.66). C25.P2 sits between C2.P1 and C25.P1; put C25 with its 3V3 pad on the C2.P1 pin row, or rotate it 180°.”
These are checker-estimated route/loop metrics, not newly routed copper. Next safe power-stage work should be a coordinated output-bank/L1 placement plan rather than another isolated C25 reversal: earlier bank rotations created LX2/VOUT access failures. No rule was relaxed to hide a finding.
Routing preflight and standard-via assessment
Read-only preflight reports 89 components / 83 nets and exactly:
  • Warning — ROUTING_OVERLAPPING_PINS_SAME_NET: the two MK1 GND pads overlap and belong to the same net; the router treats them as one pin. This existing footprint warning remains unchanged and was not repaired in this placement-only scope.
  • Info — ROUTING_PIN_NEEDS_VIA_AT_SMD: U2.VSS_2 “modified to allow via-at-SMD” in the preflight representation. This is the existing exposed-ground-pad advisory, not evidence that a via was authored or that HDI is needed.
No new HDI/microvia requirement was identified. The unchanged stackup has a full-stack L1→L6 mechanically drilled through-via definition with 0.60 mm pad / 0.30 mm hole. At L2, the switch pad center is (8.3,14.8) mm, facing U2.BUCKOUT at (9.95,14.8) mm; the nominal facing pad-edge gap is 0.925 mm. The live escape finding is cleared, and a surface neckdown toward that corridor does not inherently require a microvia. This geometric check is not a completed routing proof.
Standard through-vias remain mandatory. U2.VSS_2's existing via-at-SMD advisory still needs a deliberate through-via/assembly decision or verification of a legal no-via-in-pad escape before routing release. Placement alone cannot certify that all ground-pad escape requirements avoid via-in-pad. No blind/buried via, microvia or via-in-pad copper was added.
Antenna reservation readback and unresolved facts
  • AE1: actual effective (18,18) mm / 315°. Preserved local rectangle center (0,-1.5) mm, size 8 × 5 mm, assigned to Mid-Layer 1/2/3/4 and Bottom. Its local axes follow the antenna rotation. This confirms the current stored reservation, not the correctness of its manufacturer datum. The existing top antenna/feed exception remains unblocked, but a complete enforceable top exclusion has NOT been authored.
  • U1: effective (-13.4,13.4) mm / 135°. Preserved local rectangles: center (5,0.75) mm, size 5 × 8.5 mm; center (10,0) mm, size 5 × 40 mm. Both active, all copper layers. No dimensions were changed or inferred anew.
  • The AE1 canonical evidence request failed in persistence with non-retryable evidence_location_invalid. An alternate canonical source returned evidence_pending; nothing was read for that alternate question. The missing fact is the exact no-ground boundary datum relative to terminals and the permitted top antenna/feed pattern inside it—not whether the datasheet documents such a pattern.
Release remains blocked by C25's two errors, unverified Wi-Fi exclusion/exception geometry, the existing exposed-ground-pad routing/assembly decision, and the earlier mechanical/RF fit caveats.
Current 55 mm placement batch — 2026-09-21
This checkpoint supersedes the obsolete 34.5 mm / 79-component placement report. Placement is provisional, not released for routing or manufacturing. No schematic components or connectivity were changed in this placement batch.
Scope status

Table


ItemStatusEvidence / blocker
55 mm circular six-copper-layer boardCompletedNative readback: circular 55 × 55 mm; six copper layers; custom-standard-6-layer, total thickness 1.48 mm. Manufacturer-approved stackup is not assigned.
Place all existing componentsCompleted89 components, all Top; 83 nets retained. Final component-body overlap, board-boundary and edge-placement checks returned no findings.
Separate RF, power, storage and acoustic sectorsCompleted, provisionalBLE upper-left; Wi-Fi upper-right; charger/regulator lower-left; storage interior; microphone upper edge; USB lower edge.
Remove obsolete authored routingCompleted per layout readbackNo routeSegment nodes in the layout summary. Generated Via-Island-0 remains as a virtual node but readback confirms computed.active=false. GND stitching density is zero and the placement-phase suppression rule is active. Re-enable deliberate stitching in the routing phase.
BLE antenna copper reservationCompleted as provisional geometryTwo U1-owned zones: local center (5, 0.75) mm / 5 × 8.5 mm and (10, 0) mm / 5 × 40 mm; active and connectedLayers=All rules. These follow U1 at 135°. Exact conformity to manufacturer edge-extension drawing still needs independent RF review.
Wi-Fi antenna complete keepout / matching layoutFailed / incomplete8 × 5 mm provisional exclusion at AE1 local (0,-1.5) mm is assigned to four inner layers and Bottom. Top antenna pattern, tuning/matching components, feed exceptions and final no-ground geometry are NOT complete. Datasheet citation verification failed; dimensions were subsequently extracted from a rendered PDF but are not citation-verified. Do not route or fill the antenna area without completing this review.
Central ~45 mm battery height exclusionFailed / unverifiedAll components are Top, but no enforced 3D height/foil exclusion was authored. Through-hole lead protrusions, acoustic aperture, battery foil versus both antenna regions, harness and insulation clearances still require the real cell/mechanical drawing.
Clean power-stage and pad-access reviewFailedLatest DRC has six power-stage Errors, one power-stage Warning and one C31 pad-access Warning; details below.
FL1 placementUnattemptedFL1 is absent from the live 89-component design. No part was invented or added in this placement-only batch.
Trace routing / manufacturing export / enclosure CADUnattemptedOutside placement-only scope.
Key placements
All coordinates are board-centered millimeters; all components are Top.

Table


RefXYRotation / note
U1 BL5340-13.413.4135°; antenna end outward
U2 nRF70021313180°
AE11818315°; provisional antenna datum
U3 storage-11-1180°
U8 storage-3.51180°
U9 storage45180°
U5 regulator-13-100°
U4 charger-9-16180°
MK1 microphone023Upper acoustic edge
J1 USB-C0-24.65Lower board edge; connector overhang intentional
J3 battery connector23.45090°; right edge
J2 debug-21.72-4.94Left edge
SW10-7.3Interior button location; enclosure interface unresolved
LED18-5Light-pipe/enclosure interface unresolved
U1 and AE1 use exact position overrides because the placement action's conservative rotated bounding-box clamp pulled them too far inward. Native board-boundary and physical-body checks subsequently reported no violations.
Verification evidence
Latest targeted DRC: 2026-09-21T21:18:29.775Z.
No findings returned for component-body overlap, components outside board, edge placement, keepout, overlapping copper, invalid layer or stackup validation. This does not certify RF performance, battery fit or final routability.
Remaining findings:
  • Error: L2 switch pad is 2.4 mm from U2 switch pins; other pad is 2.2 mm away. Checker recommends 180° reversal from its current 90° orientation.
  • Error: U2.BUCKOUT lacks a clear 1.5 mm escape, with L2.2 implicated.
  • Warning: U2.BUCKOUT-to-L2.1 estimated path is 2.9 mm for 2.4 mm air; U2.BUCKVBAT is in the corridor. Requires a deliberate L2 pad-facing/escape redesign rather than further blind local nudges.
  • Four Errors: C25 is interpreted by the power checker as a U5 output-bank HF capacitor: C2/C25 bank split (4.9 mm), 5.0 mm VOUT distance, 10.6 mm estimated hot loop, and pad orientation/detour. C25 was placed near storage; confirm its intended role from schematic support-circuit intent before moving it into the regulator bank. No role/property changes were made merely to silence the checker.
  • Warning: C31 pad-access clearance.
Final native routing preflight reported 89 components / 83 nets and only:
  1. Warning ROUTING_OVERLAPPING_PINS_SAME_NET: two MK1 GND pins overlap; router will treat them as one pin. This is a footprint-review item, not a different-net short.
  2. Info ROUTING_PIN_NEEDS_VIA_AT_SMD: VSS_2 requires via-at-SMD. Check fabrication/assembly implications before routing.
No final routing was started. Preflight reduction does not override the remaining power-stage Errors. Board density was reported as 50% nominal component area, but approximately 102.6% effective area with 1 mm routing clearance; expect local congestion despite six copper layers.
RF evidence and limits
Reference sources consulted:
BL5340 textual guidance calls for no copper on any host layer in the antenna keepout and no metal/mounting hardware in that region, with edge placement preferred. PDF drawing extraction supplied the dimensions used for the provisional zones. The exact geometry mapping and AE1 tuning pattern remain unverified; these are reservations, not an RF signoff. The top Wi-Fi no-ground boundary is explicitly unfinished so that an arbitrary blanket keepout does not silently prevent the required antenna/feed pattern.
Mechanical release blockers
The centered 45 mm battery concept may intrude into the inward edges of the RF exclusions; cell foil must be checked in 3D, not inferred from the absence of Bottom components. Also check soldered connector lead protrusions, microphone bottom port, connector mating/plug envelopes and insulation. A 55 mm PCB does not establish fit inside a 55 mm outside-diameter enclosure: wall and assembly clearances remain unresolved. Finished height and battery capacity/fit are not certified.
Handoff
The initial all-component floorplan and routing cleanup are complete. The overall placement gate remains open pending power-stage remediation, C31 escape clearance, complete Wi-Fi antenna pattern/keepout verification, and battery/enclosure geometry. Preserve the 89-component schematic while resolving these items; do not treat this checkpoint as permission to route or manufacture.
  • Targeted correction pass — 2026-09-21, final check 21:43:50 UTC

  • Requested-item status

  • Final coordinates and rotations

  • Live verification sequence

  • Exact remaining switching-stage errors

  • Routing preflight and standard-via assessment

  • Antenna reservation readback and unresolved facts

  • Current 55 mm placement batch — 2026-09-21

  • Scope status

  • Key placements

  • Verification evidence

  • RF evidence and limits

  • Mechanical release blockers

  • Handoff