Final routing-readiness placement pass — full placement permission
The user explicitly authorizes moving any components needed to proceed to routing. Mutate placement only; do not route.
Required outcomes
Rebuild the USB corridor so the deterministic USB-C breakout can succeed:
Keep J1 at the bottom edge.
Clear an unobstructed 3–5 mm inward corridor from J1 D+/D− pads.
Place U10 close to the end of that corridor, oriented flow-through.
Place R32/R33 immediately MCU-side of U10.
Move R18/R19, F1, D1, and other USB power/CC parts laterally out of the data-pair corridor while retaining short power/protection paths.
Eliminate the remaining U5/C2/C25 switching-stage finding. You may move the complete U5/L1/C1/C2/C25 cluster and nearby passives.
Reorganize any other clusters necessary for routing corridors, while preserving:
J1 bottom edge, MK1 top acoustic edge;
separate U1 BLE and AE1 Wi-Fi antenna perimeter sectors and keepouts;
J2/J3 service access and rear battery projection.
Finish with zero body overlaps, zero out-of-bounds, zero edge/keepout violations, and zero switching-power-stage errors.
Run routing preflight. The MK1 same-net overlapping GND-pad advisory and U2 VSS_2 via-at-SMD info may remain if no real footprint defect is present.
Stop condition
Make mutations immediately and settle after one full correction pass plus at most two targeted convergence passes. Report exact coordinates for J1/U10/R32/R33 and any remaining blockers. Do not route.
I’ll rebuild the USB/data corridor and power cluster in one deterministic pass, then use at most two targeted overlap/power-stage convergence passes before the final placement checks and routing preflight. No copper will be added.
The USB corridor is now structured correctly. I’m using the first convergence pass to pull the aligned output-cap bank below U5/L1, clearing LX2 and the remaining body conflicts without touching anchors or RF.
Completed one full correction pass plus two targeted convergence passes. The USB data corridor is cleared and all switching-power-stage findings are zero; no routing was performed.
Key coordinates
J1: (0, −24.65 mm)
U10: (0, −16.00 mm), 270°
R32: (−0.95, −12.80 mm), 90°
R33: (+0.95, −12.80 mm), 90°
Remaining blockers
C2 ↔ U4 overlap: <0.01 mm²
C5 ↔ U4 overlap: 0.39 mm²
R18 ↔ U4 overlap: 0.12 mm²
R18 pad-access warning
Preflight: C5/U4 overlapping pins on different nets
Preflight: C2/U4 overlapping same-net GND pins
Allowed advisories remain: MK1 same-net GND-pad overlap and U2 VSS_2 via-at-SMD
No out-of-bounds, edge, keepout, or switching-stage violations remain. Routing is still blocked by the U4 local overlaps.
The Nordic nRF5340 is the preferred processor because its RAM and dual-core architecture are better suited to continuous audio capture, Opus encoding, storage management, BLE, and USB than the current nRF52840 module. It does not provide Wi-Fi, so the preferred Nordic architecture adds a separately switched nRF7002-class Wi-Fi companion.
Wi-Fi is treated as a synchronization interface, not a continuously active recording interface. Continuous Wi-Fi would dominate the energy budget and cannot meet the 72-hour runtime inside the specified wearable volume.
Storage Budget
Payload-only storage for 72 hours:
Table
Encoding
Approximate payload
Practical storage target
Mono Opus, 16 kbps
0.52 GB
≥1 GB usable
Mono Opus, 24 kbps
0.78 GB
≥2 GB usable
Mono Opus, 32 kbps
1.04 GB
≥2 GB usable
Stereo Opus, 48 kbps total
1.56 GB
≥2–4 GB usable
Stereo Opus, 64 kbps total
2.07 GB
≥4 GB usable
The present two-device 256 MB raw NAND implementation is insufficient. The production design should target at least 2 GB usable for mono or 4 GB usable for stereo, including bad-block, metadata, recovery, and wear reserve.
Recording Power and Runtime Budget
First-pass battery-current targets:
Table
Operating mode
Estimated battery current
72-hour capacity with margin
Mono recording, radios off
7–10 mA
600–865 mAh
Stereo recording, radios off
8–12 mA
690–1040 mAh
Occasional BLE
+0.1–0.8 mA average
typically 650–1100 mAh total
Wi-Fi active continuously
>100 mA class
infeasible
Short Wi-Fi sync bursts
schedule-dependent
prefer USB-powered sync
Runtime gate
A protected 800–1050 mAh cell can plausibly support 72-hour mono recording only if measured production-firmware current remains at approximately 9–11 mA or less at the battery. A hard EVT acceptance test must measure the full microphone → codec → storage path, not component sleep-current sums.
Battery and Mechanical Feasibility
Plausible cell classes for the first enclosure study are approximately:
800–900 mAh: roughly 40–44 mm across and 4.5–5.5 mm thick.
1000–1050 mAh: roughly 44–45 mm across and 6–6.5 mm thick.
The 1000 mAh class is mechanically tight inside a 55 mm × 12 mm shell after adding PCB, USB-C, component height, enclosure walls, acoustic cavity, adhesive, battery swelling clearance, and two RF antenna keepouts. Cells above about 1300 mAh are not assumed feasible without a custom cell and unconventional PCB geometry.
Charging
Start with approximately 400 mA programmed charging for an 800–1050 mAh cell.
Consider 500 mA only after enclosure thermal testing.
Reduce charge current if charging while worn or while recording causes battery or charger heating.
Keep dynamic power-path operation and require a protected pack with a cell-bonded NTC.
Microphone Direction
AAD is removed from the product architecture because pre-roll requires continuous microphone operation.
Baseline recommendation:
One high-quality bottom-port digital PDM microphone.
Locate near the upper edge of the board.
Use a sealed gasketed enclosure channel aimed toward the wearer and an external acoustic mesh.
Keep switch clicks, USB insertion forces, fabric-rub points, regulators, and RF currents away from the acoustic port.
Stereo remains possible with two matched microphones and symmetric channels, but it is not the default because it increases storage, codec load, acoustic matching effort, and battery demand while offering limited benefit for close-spaced wearable speech capture.
RF and Wi-Fi Direction
nRF5340 provides BLE but not Wi-Fi.
Add an nRF7002-class companion with a dedicated load switch and local transient capacitance.
Provide distinct BLE and Wi-Fi antenna perimeter sectors and validate coexistence.
Prefer Wi-Fi synchronization while connected to USB.
If battery-powered Wi-Fi synchronization is required during recording, its duty cycle must be specified before battery and enclosure freeze.
Selected Schematic Architecture
MCU/BLE: EZURIO 453-00052R BL5340 module, avoiding direct escape of the nRF5340 dual-row 0.4 mm aQFN.
Wi-Fi: Nordic NRF7002-QFAA-R7 with switched VBAT and IOVDD rails.
Audio: Infineon IM69D130V01XTSA1 mono PDM microphone; no AAD or level-translation block.
Storage: three XTSD08GLGEAG managed NAND devices, 3 GB raw nominal with at least 2 GB usable target.
Wi-Fi RF: RFDIP2012050L5T filter and ANT162442DT-2001A2 chip antenna.
HDI and Routing Assessment
The selected BL5340 module removes the highest-risk nRF5340 fine-pitch escape. The remaining nRF7002 is a 6 × 6 mm, 0.4 mm-pitch perimeter QFN and is expected to be routable on a six-layer board using standard through-vias, fine-pitch neckdowns, and disciplined local placement. Microvias are not currently required by the architecture.
The 55 mm circular PCB provides approximately 2.5 times the area of the previous 34.5 mm board. The 800–1050 mAh battery is stacked behind the PCB and therefore consumes thickness rather than PCB routing area, although its body and foil constrain bottom-side component height and both antenna keepouts. Placement must reserve the rear battery footprint and concentrate tall components on the front or perimeter service regions.
Sourcing Policy
Every production BOM line must be verified at BOM freeze for turnkey availability through JLCPCB/LCSC or PCBWay procurement. Approved alternates should be recorded for supply-sensitive ICs, microphones, storage, crystals, connectors, protection parts, and power devices. Generic passives must be replaced by explicit production MPNs before release.
Current research found plausible JLC/LCSC records for nRF5340 and nRF7002 variants, but live stock is dynamic and must be rechecked immediately before schematic commitment and again before manufacturing release.
USB
Preserve USB-C charging, USB 2.0 device data, and DFU. The revised MCU must expose native USB full-speed device capability. Continue to use CC pull-downs, VBUS overcurrent/ESD protection, D+/D− ESD protection, source-series damping if required by the MCU reference design, local VBUS capacitance, and controlled-impedance routing.
Required EVT Measurements
Battery current during mono recording with radios off.
Battery current during optional stereo recording.
CPU headroom and dropped-frame count for the selected Opus bitrate.
Storage write current, throughput, bad-block handling, and power-fail recovery.
Wi-Fi sync throughput, transient current, and recording coexistence.
BLE and Wi-Fi RF performance with the battery and final enclosure installed.
Acoustic frequency response, self-noise, clothing rub, button click, and port/gasket leakage.
Charge time and thermal rise at 400 mA and any proposed 500 mA mode.
Full 72-hour runtime acceptance test with the production cell and firmware.