PCB Placement Cleanup


Final routing-readiness placement pass — full placement permission
The user explicitly authorizes moving any components needed to proceed to routing. Mutate placement only; do not route.
Required outcomes
  1. Rebuild the USB corridor so the deterministic USB-C breakout can succeed:
    • Keep J1 at the bottom edge.
    • Clear an unobstructed 3–5 mm inward corridor from J1 D+/D− pads.
    • Place U10 close to the end of that corridor, oriented flow-through.
    • Place R32/R33 immediately MCU-side of U10.
    • Move R18/R19, F1, D1, and other USB power/CC parts laterally out of the data-pair corridor while retaining short power/protection paths.
  2. Eliminate the remaining U5/C2/C25 switching-stage finding. You may move the complete U5/L1/C1/C2/C25 cluster and nearby passives.
  3. Reorganize any other clusters necessary for routing corridors, while preserving:
    • J1 bottom edge, MK1 top acoustic edge;
    • separate U1 BLE and AE1 Wi-Fi antenna perimeter sectors and keepouts;
    • J2/J3 service access and rear battery projection.
  4. Finish with zero body overlaps, zero out-of-bounds, zero edge/keepout violations, and zero switching-power-stage errors.
  5. Run routing preflight. The MK1 same-net overlapping GND-pad advisory and U2 VSS_2 via-at-SMD info may remain if no real footprint defect is present.
Stop condition
Make mutations immediately and settle after one full correction pass plus at most two targeted convergence passes. Report exact coordinates for J1/U10/R32/R33 and any remaining blockers. Do not route.
I’ll rebuild the USB/data corridor and power cluster in one deterministic pass, then use at most two targeted overlap/power-stage convergence passes before the final placement checks and routing preflight. No copper will be added.
The USB corridor is now structured correctly. I’m using the first convergence pass to pull the aligned output-cap bank below U5/L1, clearing LX2 and the remaining body conflicts without touching anchors or RF.
Completed one full correction pass plus two targeted convergence passes. The USB data corridor is cleared and all switching-power-stage findings are zero; no routing was performed.
Key coordinates
  • J1: (0, −24.65 mm)
  • U10: (0, −16.00 mm), 270°
  • R32: (−0.95, −12.80 mm), 90°
  • R33: (+0.95, −12.80 mm), 90°
Remaining blockers
  • C2 ↔ U4 overlap: <0.01 mm²
  • C5 ↔ U4 overlap: 0.39 mm²
  • R18 ↔ U4 overlap: 0.12 mm²
  • R18 pad-access warning
  • Preflight: C5/U4 overlapping pins on different nets
  • Preflight: C2/U4 overlapping same-net GND pins
  • Allowed advisories remain: MK1 same-net GND-pad overlap and U2 VSS_2 via-at-SMD
No out-of-bounds, edge, keepout, or switching-stage violations remain. Routing is still blocked by the U4 local overlaps.

Board Bring-Up Plan
1. Unpowered Inspection
  • Check polarity/orientation of charger, regulator, TVS, transistors, LED, battery connector, and bottom-port microphone.
  • Verify antenna keepout has no copper or battery overlap.
  • Confirm no shorts between VBUS, SYS, BATTERY, 3V3, 1V8_MIC, and GND.
2. USB Power Without Battery
  • Apply current-limited 5 V USB power.
  • Verify VBUS_PROTECTED near 5 V, SYS valid, 3V3 within tolerance, and 1V8_MIC within tolerance.
  • Confirm excessive current/heat is absent.
  • Check PGOOD behavior and default 100 mA charger mode.
3. Battery and Charging
  • Attach a protected 1S three-wire pack with correct polarity and a cell-bonded compatible NTC on J3 pin 3.
  • Verify fuel-gauge communication and plausible voltage/SOC.
  • Verify the actual cell-bonded NTC resistance/curve, TS trip window, and charging inhibition when the cell is heated/cooled beyond intended limits.
  • Confirm approximately 250 mA programmed charge current only when source policy permits; inspect thermal rise.
  • Run enclosed thermal validation at 250 mA and log cell, U4, connector, regulator, and enclosure temperatures.
4. SWD and MCU
  • Connect project-specific TC2030 cable mapping.
  • Read device ID, erase Raytac factory test firmware, program a minimal board test, and verify reset.
  • Program and verify the initial bootloader over SWD before testing USB DFU.
  • Verify LF crystal startup and RTC progression.
5. USB
  • Enumerate at full speed and verify D+/D− integrity.
  • Confirm R32/R33 are 27 Ω, C23 is 10 µF at U1 VBUS, and the MCU/protected/connector USB net segments are continuous with no bypass around the resistors.
  • Confirm firmware changes charger input limit only after enumeration.
  • Test DFU and mass-storage export without corrupting stored data.
6. Audio
  • Confirm 1.8 V rail and level-translator directions.
  • Capture PDM in normal mode and verify speech waveform/noise floor.
  • Configure AAD, verify wake thresholds, and measure quiet current.
  • Check for switching, LED PWM, USB, and RF noise coupling into audio.
7. Storage
  • Identify both NAND chips, read IDs, scan factory bad blocks, and run page program/read/erase tests.
  • Power-cycle during write/finalize and confirm filesystem recovery without losing prior clips.
  • Record continuously until at least 24-hour equivalent data volume is written/read back.
8. UI and Runtime
  • Verify first press includes the preceding 10 seconds and second press closes the clip.
  • Verify all LED colors and low-battery behavior.
  • Measure quiet AAD current, active recording average/peak current, and runtime on the selected cell.
Pass Criteria
  • All rails in tolerance; no unsafe heating.
  • USB charge/data/DFU all functional through one connector.
  • Audio, pre-trigger buffer, timestamps, two-bank NAND, button, LED, BLE radio, and low-battery handling pass.
  • Measured quiet average supports five days; measured active average determines whether 12 or 24 hours is the defensible recording claim.
  • The 24-hour claim is released only after bitrate, NAND ECC/bad-block behavior, active power, cell capacity, and thermal measurements all pass.
  • 1. Unpowered Inspection

  • 2. USB Power Without Battery

  • 3. Battery and Charging

  • 4. SWD and MCU

  • 5. USB

  • 6. Audio

  • 7. Storage

  • 8. UI and Runtime

  • Pass Criteria