Welcome to Flux


How would you describe your current role?
Hardware founder / entrepreneur
How did you hear about Flux?
AI (ChatGPT, Perplexity, Gemini, Claude, etc.)
Thanks! It really helps us to know that. Do you have a specific project in mind already?
Yes, well-defined
What's your goal with this project?
Personal or learning
Great! Let's get started on your project.
We can work on the spec together, and I can give you a sense of feasibility, timeline, and cost. Next, we can start building a working prototype.
Can you tell me what you want to build, or what problem you want to solve with it?
If you have some existing documents, or sketches already, feel free to drop them in as well.

No schematic drawn yet

Your and are available in the table tabs. Ask Flux to draw the schematic, or draw it yourself.

Production Readiness Report
Review date: 2026-09-03
Overall result: Not released for production. PCB routing and the requested silkscreen cleanup are complete, but sourcing, BOM, physical-fit, and motor-rail qualification gates remain.
Scope Status

Table


Scope itemStatusEvidence / blocker
J1 pin labels P8→P1 below header rowCompletedVerified in live vector layout at Y = 22.8 mm, aligned to physical pads
Separate J1/R1/LED1 labelsCompletedVerified in live vector layout
Motor contact labels: contact 3 M+, contact 4 M−CompletedVerified on J2–J5 after confirming all eight live net mappings
Add supplied Chakra monkey logo and textCompletedReal Top Silkscreen vector geometry plus “Chakra”; verified in vector layout
Preserve routing/connectivityCompletedFresh routing state: 0 airwires, 0 dangling traces
PCB DRC production checksCompleted with warningsNo reported PCB errors in requested categories; 14 intentional override warnings remain
Manufacturer part-number reviewCompleted with placeholdersMissing-MPN check cleared; J2–J5 use an explicit placeholder pending approved supplier part
ERC reviewCompleted, not clean18 known artifact/library errors: 17 Interocitor-related and U1 VP false power-pin classification
Comprehensive operation/wiring documentationCompletedpcb-operation-and-wiring-guide updated with every live net and component pin map
Bring-up and validation procedureCompletedboard-bring-up-plan updated
Complete manufacturing package exportUnattemptedBlocked by inaccurate automatic capacitor BOM and unresolved release gates
Fresh Verification Snapshot
  • Board: 100 × 100 mm, 2 layers, nominal 1.50 mm.
  • Layout: 30 nets, 201 route segments, 42 vias, one copper fill.
  • Routing state: 0 airwires, 0 dangling traces.
  • Stackup: 0.035 mm top copper + 1.499 mm core + 0.035 mm bottom copper, with mask and overlay layers.
  • Manufacturer-part-number check: no current missing-MPN errors.
  • PCB issue scan: only the 14 intentional !important/artifact-exclusion warnings were returned.
  • ERC: 16 floating undefined Interocitor pins, one unannotated Interocitor artifact, and U1 VP reported incorrectly as an unpowered power pin.
Blocking Items
1. Custom motor-jack MPN and physical fit
J2–J5 now carry PLACEHOLDER-CB-6P6C-12MM-STAGGER. An approved manufacturer/supplier MPN must replace it. Confirm all six staggered contacts, 0.90 mm drills, 1.40 mm pads, and the two 2.30 mm mounting holes on 12 mm centers against a physical sample.
2. Automatic BOM incorrectly merges C1/C2/C3
C1/C2 are AISHI SPZ1AM331E08O00R, 330 µF/10 V. C3 is AISHI ERS1AM471E12OT, 470 µF/10 V. Flux's current grouped BOM reports all three as SPZ1AM331E08O00R because all are instances of the same Generic Capacitor library part. The correct release BOM must split them as quantity 2 and quantity 1. A missing-part request for ERS1AM471E12OT has been submitted.
3. Socket hardware is not represented as separate BOM lines
Release BOM needs exact MPNs for:
  • 2 × 1×19 female socket strips for U1,
  • 4 × 1×8 female socket strips for U2/U3,
  • any module-side male headers not included with the purchased modules.
4. Measured module footprints require physical qualification
The design uses user-measured U1 row spacing of 24.75 mm and U2/U3 row spacing of 14.75 mm, with controlling envelopes of 55 × 28 mm and 21 × 18 mm. These are encoded in the PCB but cannot be physically verified by software. Use calipers and a 1:1 print before fabrication.
5. Motor-rail capacitor voltage margin
C1/C2 are 10 V parts on an 8 V nominal rail. Motor regeneration can raise the rail. Qualify worst-case peak voltage with the intended supply/harness and target <9.0 V peak, or use compatible 16 V capacitors/add a suitable clamp.
6. Undeletable stale database artifact
The inactive Alternative Tomato Interocitor and nested stale U3 remain in the project database because supported deletion paths fail. Their pads, footprint, graphics, and layout are disabled and parked off-board. They do not appear in the functional netlist/routing, but final Gerber and drill plots must be inspected to confirm zero exported geometry.
BOM Audit

Table


QtyRef.Intended MPNCurrent disposition
1U1ESP32-DEVKITC-VEExact module MPN; physical row spacing still sample-verified
2U2,U3Pololu 713Exact module MPN; socket hardware separate/TBD
1J1SSQ-108-03-G-SExact orderable MPN corrected
4J2–J5PLACEHOLDER-CB-6P6C-12MM-STAGGERBlocking placeholder
2J6,J71729128Exact MPN
2C1,C2SPZ1AM331E08O00RExact MPN; 10 V margin needs validation
1C3ERS1AM471E12OTExact MPN exists; grouped BOM export is wrong
1R1CFR-25JB-52-1KExact MPN
1LED1LTL-4233Exact MPN
4H1–H4Mechanical 3.2 mm NPTHExcluded from BOM
Manufacturing Export Decision
Gerber/drill, BOM, and IPC-D-356 were not generated in this pass. A complete manufacturing handoff would be misleading while the automatic BOM is known to be wrong and the custom connector/socket/physical-fit gates are open. Close the blockers, rerun routing state + PCB checks, visually inspect final Gerbers, then generate the package.
  • Scope Status

  • Fresh Verification Snapshot

  • Blocking Items

  • 1. Custom motor-jack MPN and physical fit

  • 2. Automatic BOM incorrectly merges C1/C2/C3

  • 3. Socket hardware is not represented as separate BOM lines

  • 4. Measured module footprints require physical qualification

  • 5. Motor-rail capacitor voltage margin

  • 6. Undeletable stale database artifact

  • BOM Audit

  • Manufacturing Export Decision