The “38999 Cable Tester” executor reports completion, but I could not access its detailed report, inspect the resulting schematic, or reconcile its changes against the outstanding functional checks. No additional project changes were made in this turn.
Still required before PCB work resumes:
- Verify all 55 contacts are scanned exactly once.
- Validate hit capture, MULTIPLE indication, and NEXT-button sequencing.
- Check displayed contact-number conversion and reset/startup behavior.
- Confirm unused CMOS inputs are tied to defined logic levels.
- Run fresh ERC/connectivity checks and an independent schematic review.
Execution stopped because your ACUs ran out.