MILSPEC Continuity Tester


Created a thread
38999 Cable Tester
Needs input
View Thread
I stopped PCB work and audited the schematic baseline: it currently contains 95 components, 164 nets, and no open ERC findings as of the latest check. A dedicated executor completed a deeper pin-level audit/correction pass, but I could not retrieve or independently verify its report or applied changes.
Still required
  • Reconcile the executor’s schematic changes.
  • Verify scan coverage, hit capture, MULTIPLE logic, NEXT behavior, display conversion, reset behavior, and unused CMOS inputs.
  • Run a fresh ERC and independent logic review.
  • Keep PCB placement/routing paused until those checks pass.
Execution stopped because your ACUs ran out.
Received notification from "38999 Cable Tester" that it finished — picking the work back up.
The “38999 Cable Tester” executor reports completion, but I could not access its detailed report, inspect the resulting schematic, or reconcile its changes against the outstanding functional checks. No additional project changes were made in this turn.
Still required before PCB work resumes:
  • Verify all 55 contacts are scanned exactly once.
  • Validate hit capture, MULTIPLE indication, and NEXT-button sequencing.
  • Check displayed contact-number conversion and reset/startup behavior.
  • Confirm unused CMOS inputs are tied to defined logic levels.
  • Run fresh ERC/connectivity checks and an independent schematic review.
Execution stopped because your ACUs ran out.
Review tester schematic
Check contact coverage
Review sequencing logic
Check CMOS inputs
Run electrical review

Waiting for input


Schematic of Modular 38999 Cable Tester
DS1
U25
U26
DS2
U23

Modular 38999 Cable Tester

Modular 38999 Cable Tester thumbnail