SYSTEM interconnect schematic


Thought for 13 mins 10 sec
Thought for 9 sec
Referenced guidance.
1/3 Create the SYSTEM sheet with 12 hierarchical interconnect blocks and required callout

Create the SYSTEM sheet with 12 hierarchical interconnect blocks and required callout

Add and verify named system nets and enclosure/off-sheet ports

Verify architecture locks and inventory all blocks, ports, and invented parts

Accessed knowledge for the next task.
Thought for 20 sec — Creating clear rules
Created a thread
Schematic Architecture Update
Completed
View Thread
Thought for 8 sec
Awaiting 1 background task
Received notification from "Schematic Architecture Update" that it finished — picking the work back up.
The build has landed. I’m reconciling its exact inventory and checking the new architecture against the required blocks, ports, fail-safe behavior, and prohibited implementation details now.
Implemented and verified the system interconnect as a dedicated SYSTEM functional group: 12 architecture blocks, 8 enclosure ports, 37 named nets, and the complete 12-line specification callout. The original 189-component concept remains untouched; all 21 new instances are excluded from PCB, BOM, and pick-and-place, and no PCB layout or high-power copper was created.
Blocks: GRID_PASSTHROUGH, SERVICE_CT, AC_INTERFACE, TTYPE_NPC, HV_DC_BUS, PV_MPPT, BATT_IF, MISC_IF, SENSE_PROT, CTRL_PCS, AUX_PSU, THERMAL.
Off-sheet/enclosure ports: GRID_INPUT_200A, LOAD_OUTPUT_200A, SOLAR_PV_INPUT_15_20KW, BATTERY_BIDIRECTIONAL_15_20KW, MISC_DC_BIDIRECTIONAL_10_15KW, WHOLE_HOME_CT_INPUTS, COMMUNICATION_PORTS, GROUNDING_LUG.
Invented architectural part types: GRID_PASSTHROUGH_ARCH_MOCK, SERVICE_CT_ARCH_MOCK, AC_INTERFACE_ARCH_MOCK, TTYPE_NPC_ARCH_MOCK, HV_DC_BUS_ARCH_MOCK, PV_MPPT_ARCH_MOCK, BATT_IF_ARCH_MOCK, MISC_IF_ARCH_MOCK, SENSE_PROT_ARCH_MOCK, CTRL_PCS_ARCH_MOCK, AUX_PSU_ARCH_MOCK, THERMAL_ARCH_MOCK, SPLIT_PHASE_200A_ENCLOSURE_PORT_ARCH_MOCK, PV_ENCLOSURE_PORT_ARCH_MOCK, BATTERY_ENCLOSURE_PORT_ARCH_MOCK, MISC_DC_ENCLOSURE_PORT_ARCH_MOCK, WHOLE_HOME_CT_ENCLOSURE_PORT_ARCH_MOCK, COMMUNICATION_ENCLOSURE_PORT_ARCH_MOCK, GROUNDING_LUG_ARCH_MOCK, SYSTEM_SPEC_CALLOUT_ARCH_MOCK.
Open item: Flux currently exposes no schematic-sheet creation/renaming operation, so SYSTEM is isolated as a functional group in a separate canvas region rather than a physical sheet tab; the existing concept could not be renamed CONCEPT-DO-NOT-LAYOUT. Full connectivity evidence and the net inventory are recorded in system-architecture-implementation-report.

Thermal and Mechanical Concept
Envelope and Massing
  • Concept cabinet: about 1100 mm H x 750 mm W x 350 mm D, wall mounted.
  • Preliminary installed mass: roughly 90-160 kg depending on magnetics, switchgear, cold plates, coolant, and bus structures; requires structural and lifting review.
  • Segregated top service/bus bay, central power-conversion bay, lower control/cable bay, and side heat-exchanger/plumbing zone.
Cooling Architecture
  • Closed corrosion-controlled liquid loop contacts grid SiC, PV DC/DC, battery DC/DC, miscellaneous DC/DC, and selected magnetics through direct cold plates.
  • Pump pulls from reservoir/degas volume, feeds a manifold with balanced branches, returns through an internal liquid-to-air radiator, then back to reservoir.
  • Dual or redundant-capability fans move outside air through a rain-shedding louver path across the radiator; outside air does not circulate through HV electronics.
  • Flow, inlet/outlet temperature, pressure or differential pressure, reservoir level, pump current, leak tray, and cabinet temperature are monitored.
Preliminary Heat Estimate
Assumptions: 20-30 kW conversion, 96.5-98 percent path efficiency, simultaneous auxiliary converter loading may add losses, and outdoor solar/ambient loading remains TBD.

Table


ConditionEstimated electronics heat
20 kW at 98 percentabout 0.4 kW
30 kW at 98 percentabout 0.6 kW
30 kW at 96.5 percentabout 1.1 kW
Multi-port/high ambient design rangeabout 1.5-3.0 kW preliminary removal capacity
A preliminary cooling target is 2-3 kW rejected at worst rated ambient with fouling and fan/pump degradation margin. Exact coolant flow follows cold-plate pressure drop and permitted temperature rise; for water-glycol, 10-25 L/min total is a study range, not a selected value.
Internal Zones
  • Top: service-rated busbar, bypass, branch protection, CTs, surge devices, finger-safe barriers.
  • Center left: SiC inverter and laminated bus on cold plates.
  • Center right: PV, battery, and miscellaneous DC converters and common DC-link enclosure.
  • Lower left: isolated controller/safety bay, communications, auxiliary supplies.
  • Lower right/side: pump, reservoir, manifold, radiator, fans, drain/fill and leak tray.
  • Bottom: segregated gland plates for GRID 200A, SOLAR PV, BATTERY HVDC, BIDIR DC, CT INPUTS, COMMS, and GROUND.
Materials and Corrosion Controls
  • Powder-coated galvanized or stainless sheet-metal cabinet concept.
  • Copper or plated copper buswork with joint compounds and controlled interfaces.
  • Aluminum cold plates/radiator only if all wetted metals and coolant chemistry are compatible; avoid mixed copper/aluminum loops without an engineered inhibitor and isolation strategy.
  • Use compatible EPDM or application-qualified seals, deionized-water/glycol coolant formulated for electrical thermal loops, corrosion inhibitor, biocide as needed, and coolant conductivity monitoring where justified.
NEMA 3R Approach
  • Sloped overhanging rain hood and drip edge.
  • Gasketed hinged front door with compression latches and deliberate water-shedding seam.
  • Side or lower downward-facing louver hoods; radiator airflow path includes drain channels and splash baffles.
  • No upward-facing cable penetrations; bottom gland plates with drip loops and listed fittings.
  • NEMA 3R is a design target only; hose-down, ice, dust, insects, UV, salt, and condensation requirements require environmental testing and may drive a higher enclosure rating.
Service Access
  • Front service door; dead-front barriers separately removable only after de-energization.
  • Power modules and cold plates removable from the front without disturbing service bus where feasible.
  • Accessible fill, bleed, drain, filter/strainer, pump, fan, and radiator modules.
  • Adequate conductor bending space, lug tool access, torque marking, lockout/tagout points, arc-flash labels, and touch-safe covers must be developed.
Open Mechanical Studies
Structural wall loading, seismic/wind requirements, lifting points, condensation management, acoustic limits, fan redundancy, radiator sizing, hose permeation, pressure relief, coolant fire/toxicity, cable bending radii, and field-service clearances remain preliminary.
  • Envelope and Massing

  • Cooling Architecture

  • Preliminary Heat Estimate

  • Internal Zones

  • Materials and Corrosion Controls

  • NEMA 3R Approach

  • Service Access

  • Open Mechanical Studies