The project currently lists 38 components and 40 nets, consistent with the expected component count after Stage 2, but I have not verified its wiring or NC flags. No additional changes were made this turn.
Remaining work is to check the 21 Stage 2 components against the approved net table, verify all 23 MCU NC pins, and confirm the Stage 1 connections and later-stage interface labels. Execution stopped because your ACUs ran out.