Project Review Request
Table
| Part Category | Preferred Package | Notes |
|---|---|---|
| General resistors | 0603 or 0805 | Use 0603 where density matters, 0805 where hand rework margin is beneficial |
| General capacitors | 0603 or 0805 | Keep bulk caps large enough for capacitance/voltage stability |
| Pull-ups / pull-downs / series resistors | 0603 | Default small-signal passive size |
| Indicator/data-conditioning passives | 0603 | Keeps placement compact near LED and MCU |
| Small diodes / ESD devices | SOD-323, SOD-123, or DFN-style protection arrays | Choose based on surge and footprint availability |
| Small transistors / level shifting | SOT-23 or SC70 only if density forces it | Prefer SOT-23 for easier prototype rework |
| LDO regulator | SOT-23-5, SOT-223, or DFN/QFN with proven thermal margin | Prefer simple, common footprints first |
| Test pads | Simple round or rectangular SMT pads | Sized for pogo-pin access |
| USB-C connector | Reinforced mid-mount or edge-mount style with shell stakes/anchor tabs | Mechanical robustness is mandatory |
Table
| Item | Type | Status | Notes |
|---|---|---|---|
| Exact legacy LED center coordinate | Open question | Open | Needed before final placement lock |
| Exact USB-C datum from legacy board | Open question | Open | Must be validated against mechanical reference before layout freeze |
| SK6812 logic-high compatibility from 3.3 V controller | Risk | Open | Resolve by supply-voltage choice, level shifting, or validated direct-drive margin |
| 2-layer adequacy for RF, USB, and return paths | Risk | Open | Prototype layout and testing must confirm before production lock |
| Final regulator choice vs thermal margin and cost target | Open question | Open | Select during schematic capture with BOM bucket discipline |
| USB connector exact part selection | Open question | Open | Must satisfy enclosure fit and reinforced retention requirement |
| Bottom-side component count creep | Risk | Open | Keep minimal unless justified by layout or mechanics |
| Distributor availability for critical parts | Risk | Open | Check before schematic freeze and note any single-source exceptions |
Objective
Locked Product Constraints
Critical Change-Control Warning
First-Pass Schematic Scope
In scope
Out of scope for first pass
BOM Cost Targets and Sourcing Guidelines
Cost targets
Sourcing rules
Preferred Package Sizes and Manufacturability Guidance
Preferred baseline packages
Manufacturability rules
Preliminary ERC Checklist for Schematic Handoff
Preliminary DRC / Layout Readiness Checklist
Review Log: Open Questions, Risks, and Exceptions
Execution Sequence for the First-Pass Schematic