The project is empty (0 components, 0 nets). No sensor, circuit topology, components, firmware, or mechanical design has been selected or implemented.
Inputs needed before circuit design
Target gas or gases, measurement range, and required accuracy.
Available supply voltage and whether loop-powered operation is required.
Receiving equipment wiring: clarify whether sink/source means an externally powered passive current output versus an actively powered current output; obtain receiver wiring requirements.
Intended environment: ordinary indoor monitoring or hazardous/explosive-area use; applicable ce...
I captured your requirements in Gas Detector Requirements: an intelligent gas detector with a 4–20 mA output and hardware-selectable sink/source operation. No circuitry has been added yet.
Before selecting the sensor and output circuit, I need:
Target gas and range: for example, methane in %LEL or CO in ppm.
Power supply: available voltage, and whether the detector must run from the current loop.
Receiver wiring: the PLC/input-module model or wiring diagram, to confirm what sink/source operation must support.
Environment: ordinary monitoring or hazardous/explosive-area use, including any certification requirements.
Component research and circuit implementation will need Agent mode once these requirements are clear.
The project is empty (0 components, 0 nets). No sensor, circuit topology, components, firmware, or mechanical design has been selected or implemented.
Inputs needed before circuit design
Target gas or gases, measurement range, and required accuracy.
Available supply voltage and whether loop-powered operation is required.
Receiving equipment wiring: clarify whether sink/source means an externally powered passive current output versus an actively powered current output; obtain receiver wiring requirements.
Treat life-safety or hazardous-area operation as a certification-driven product requirement, not as an assumption that a prototype is safe for deployment.
Resume point
Resolve the input questions, then define the product architecture and select the sensor and configurable 4–20 mA interface before schematic work. Execution stopped because the account ran out of ACUs.