#701d1003.Table
| Scoped item | Status | Result |
|---|---|---|
| Clear four C26 pad-2 overlapping-copper errors | Completed | Removed only the four offending old-footprint routing objects: I2S_BCLK smart via at (5.5953, 23.1526), its local Top segment, and two stale 3V3_SYS/old-land trace segments. Final overlapping-copper count: 0. |
| Restore routing affected by C26 cleanup | Partially completed | 3V3_SYS was rerouted successfully with a 5.799 mm, two-layer route and one via. The unaffected downstream I2S_BCLK Top chain was reconstructed; the remaining local bypass could not be completed without new overlaps. |
| Route GND U3:GND::1 ↔ C15:P2 | Failed after two genuine approaches | Approach 1: direct 0.10 mm deterministic route, blocked-no-path. Approach 2: through-hole via-at-U3-pad/L2 escape followed by 0.10 mm route to C15:P2, also blocked-no-path; the unsuccessful via was removed. L2 was not used for signal routing and remains the GND plane. |
| Route REG_EN Trace 5967 ↔ S1:2 | Failed after two genuine approaches | Approach 1: 0.254 mm route from Trace 5967 to S1:2, blocked-no-path. Approach 2: 0.10 mm route, blocked-no-path. No global rule relaxation or placement change was made. |
2026-08-15T22:20:54.388Z.c066192b… ↔ Trace 8642….Trace 8642 group), pending the local bypass.J1).#701d1003 shows only net child lists and trace/via node paths. No component position, positionX, positionY, rotation, rotationZ, or layer property path changed. The temporary unsuccessful I2S bypass was reverted, and the temporary GND via was deleted. Immutable-placement audit: PASS.Scope and baseline