Chat


How can I help you?

Explain project
Write a project description
Find schematic issues

Owner Placement Run Report
Commit: #a064bd8b (single delegated pass)
Scope status
  • IMU block deletion — partial: U5, R18, R19, and C28 were removed from schematic and PCB. U3 GPIO38/IO38 and GPIO39/IO39 were disconnected and marked no-connect. The requested net names IMU_SDA and IMU_SCL did not exist in the project; the actual connections were named GPIO38 and GPIO39. Those net objects are now empty. The pre-existing IMU_INT1 net object is also empty and was not deleted because it was not in the explicit deletion list.
  • Placement table — partial: every exact table entry was applied or confirmed at its existing exact value. U4 was set to (31.50, -8.00), Top, 180°, placing its ANT-pin side toward +X. ANT1 was retained at (41.00, -8.00), Top, 0° because the table gives an approximate ~41.20 rather than an exact coordinate and its clearance/on-board constraints are mutually incompatible.
  • U3 support re-seat — completed: only C13, C14, C15, and R14 were locally moved; rotations remained 0° and layers remained Bottom. Final centres: C14 (-35.30, 10.40), C15 (-32.60, 10.40), C13 (-30.10, 10.40), R14 (-32.50, 11.60). Centre-to-pin distances are 2.64 mm (C14→3V3), 1.77 mm (C15→3V3), 2.49 mm (C13→EN), and 2.95/2.90 mm (R14→3V3/EN).
  • Routing — completed/no action: no routing, rip-up, trace editing, optimization, auto-layout, or placement optimization was performed.
Placement findings
Same-side courtyard overlaps
  • U4 ↔ ANT1, Top: the immediate placement check flags the U4 placement as an overlapping-component issue. Using the final readback envelopes, U4 ends at approximately x = 40.08 mm; ANT1's 1.8 mm footprint at x = 41.00 mm begins at x = 40.10 mm, leaving only about 0.02 mm nominal envelope gap, below the required 0.5 mm courtyard clearance.
  • No other current same-side component overlap was reported by the placement check; it resolved six pre-existing overlap findings and introduced this one U4 finding.
Off-board
  • None detected. ANT1 spans approximately x = 40.10…41.90 mm at y = -8 mm, inside the x = 42 mm board edge.
U3 antenna direction
  • U3 is Bottom at (-29.25, 0.00), rotation -90°; its antenna end faces the −X edge, as required.
U4 ↔ ANT1 clearance and blocker
  • Final centre spacing: 9.50 mm along X.
  • Nominal footprint-envelope gap: approximately 0.02 mm; effective courtyard clearance fails the >=0.5 mm requirement.
  • The table is internally inconsistent: ANT1 is a 1.8 mm footprint, so fully on-board at the +X = 42 mm edge requires centre x <= 41.10 mm. With U4's readback right envelope at x ≈ 40.08 mm, a 0.5 mm gap requires ANT1 centre x >= 41.48 mm. No ANT1 X coordinate can satisfy both constraints. The stated ~41.20 mm is also approximate, not exact.
Required final centres

Table


DesignatorX (mm)Y (mm)LayerRotation
M1-28.00-28.00Bottom0°
M228.0028.00Bottom0°
M3-28.0028.00Bottom0°
M428.00-28.00Bottom0°
U3-29.250.00Bottom-90°
U431.50-8.00Top180°
J30.00-17.50Top90°
S138.8520.00Top90°
LED10.0024.00Top0°
SW40.00-26.00Top0°
BZ10.0034.50Top0°
Change-scope confirmation
  • Deliberately moved/rotated only U4, plus the explicitly authorized local re-seat of C13, C14, C15, and R14.
  • All other placement-table designators were already at their specified centres/layers/rotations and were confirmed without movement.
  • PCB deletions were limited to U5, R18, R19, and C28 as a consequence of the requested schematic component deletion.
  • No routing operation was invoked. The immediate DRC also reported 14 copper-overlap findings after movement; these were not altered because trace work was explicitly prohibited.
  • Scope status

  • Placement findings

  • Same-side courtyard overlaps

  • Off-board

  • U3 antenna direction

  • U4 ↔ ANT1 clearance and blocker

  • Required final centres

  • Change-scope confirmation