Chat


How can I help you?

Explain project
Write a project description
Find schematic issues

Owner Change Set Completion
Scope status

Table


ItemStatusResult
Exact LSM6DS3TR-C sourcing and useCompletedExact MPN used; no substitute.
All-DNP IMU schematic blockCompletedU5, C28, R18, R19, TP17 added, wired and PCB-included.
Microphone X-configurationCompletedAll four mic centres set to the owner coordinates on Bottom; dedicated capacitor pairs moved with each mic.
UI/RF/mechanical owner overridesCompletedJ3, LED1, SW4, J1, U4/ANT1, U3 and mounting holes repositioned; local support groups moved only where needed to remove collisions.
Affected route cleanupCompletedI2S route deletion was requested for all four affected nets; no existing I2S copper was present, so 0 segments were removed. Final dangling-trace count is 0.
Full-board routingUnattempted by scope154 airwires remain, as expected before routing.
IMU sourcing evidence
  • Exact device: STMicroelectronics LSM6DS3TR-C.
  • LCSC part number: C967633.
  • LCSC page: https://www.lcsc.com/product-detail/C967633.html
  • Stock evidence retrieved on 2026-08-14: 7,000 units in stock, ships now.
  • Package: LGA-14 (2.5 × 3.0 mm).
  • ST product status: Active / volume production.
  • Flux library searches by exact MPN and agentic functional search found no existing usable library part. An exact datasheet-backed part was therefore created and published without substitution: /agamrossen/lsm6ds3tr-c
  • The created part was verified as 14 terminals and 14 distinct non-overlapping LGA pads using the ST pin table and the official KiCad LGA-14_3x2.5mm_P0.5mm_LayoutBorder3x4y land pattern.
Added DNP designators and assembly handling

Table


DesignatorPart/valueAssembly statePCB state
U5LSM6DS3TR-C, C967633Exclude from BOM = true; Exclude from Pick & Place = trueIncluded; footprint present
C28100 nF, 10 V, 0603Exclude from BOM = true; Exclude from Pick & Place = trueIncluded; footprint present
R184.7 kΩ, 1%, 0603Exclude from BOM = true; Exclude from Pick & Place = trueIncluded; footprint present
R194.7 kΩ, 1%, 0603Exclude from BOM = true; Exclude from Pick & Place = trueIncluded; footprint present
TP17IMU INT1 test pointExclude from BOM = true; Exclude from Pick & Place = trueIncluded; Bottom footprint present
No added item has Exclude from PCB set.
IMU wiring
  • U5:SDA → GPIO38 → U3:IO38, existing TP12, and R18:P1.
  • U5:SCL → GPIO39 → U3:IO39, existing TP13, and R19:P1.
  • R18:P2, R19:P2 → 3V3_SYS.
  • U5:VDD, U5:VDDIO, U5:CS → 3V3_SYS.
  • C28:P1 → 3V3_SYS; C28:P2 → GND.
  • U5:SDO/SA0 → GND, selecting I2C address 0x6A.
  • U5:SDx, U5:SCx, U5:GND pins 6 and 7 → GND.
  • U5:INT1 → dedicated net IMU_INT1 → TP17.
  • U5:INT2, NC10, NC11 are intentionally no-connect.
  • The owner-specified exactly one 100 nF capacitor was used across the common 3V3_SYS/GND supply; no second VDDIO capacitor was added.
Verified PCB placement
Microphones and dedicated decoupling
All microphones remain on Bottom.

Table


MicExact centre (mm)Data pair100 nF1 µF
M1(-21.21, -21.21)I2S_SD_AC16 (-23.71, -19.41)C17 (-23.71, -23.01)
M2(+21.21, +21.21)I2S_SD_AC18 (+23.71, +23.01)C19 (+23.71, +19.41)
M3(-21.21, +21.21)I2S_SD_BC20 (-23.71, +23.21)C21 (-18.71, +23.21)
M4(+21.21, -21.21)I2S_SD_BC22 (+18.71, -17.80)C23 (+23.71, -17.80)
The M4 capacitor pair was moved to the inner/upper side of M4 to clear the WROOM edge region while remaining local to M4.
Acoustic ports
Each microphone retained its component-owned centered acoustic feature:
  • NPTH drill: 0.900 mm.
  • Nominal no-copper ring geometry: 1.025 mm diameter.
  • Radial copper keepout: 0.0625 mm.
  • Port offset relative to each microphone footprint: (-0.710 mm, 0).
  • Connected layers: All for the NPTH.
UI, RF and mechanical

Table


ItemCentre / placementLayer / notes
J3(0, +24) mmTop, vertical; 21.35 mm length extends inward to y=+13.33 mm, adjacent to the board-centre area and clear of switcher copper.
LED1(-26, 0) mmTop, mid-left.
SW4(+26, 0) mmTop, mid-right.
J1 USB-C(0, -36.9) mmBottom; X-centred on the -Y edge. The placement tool clamped Y from -38.23 mm to the valid footprint/body position while preserving the centred connector exit.
U4 Ra-01H(-22, -30) mmTop; ANT pad faces the -Y-left corner.
ANT1(-32, -40) mmTop; external antenna solder exit with 3 mm keepout/min-keepout.
U3 WROOM(+18, -37.2) mm, 180°Bottom; antenna end intentionally overhangs the -Y-right edge.
H1(-34, +34) mmVerified 2.5 mm NPTH.
H2(+34, +34) mmVerified 2.5 mm NPTH.
H3(+34, -34) mmVerified 2.5 mm NPTH.
H4(-34, -34) mmVerified 2.5 mm NPTH.
The two RF exit regions are separated: LoRa is at the -Y-left corner and the WROOM antenna is at the -Y-right edge.
DNP IMU block PCB placement

Table


DesignatorCentre (mm)Layer
U5(12.0, 29.0)Top
C28(15.3, 29.2)Top
R18(9.5, 32.0)Top
R19(12.5, 32.0)Top
TP17(16.0, 32.0)Bottom
Route cleanup and validation evidence
  • Explicitly deleted PCB routing for: I2S_BCLK, I2S_WS, I2S_SD_A, I2S_SD_B.
  • Tool result: no routing existed on those nets, so 0 trace/via objects removed.
  • Final routing-state readback: 0 dangling traces.
  • No full-board route was run.
  • Final requested placement/copper checks returned no ERROR, WARNING or OPEN findings for component-body overlap, copper overlap, protected intrusions, edge placement, component outside board, or dangling traces.
  • Final single electrical/ERC retrieval returned no ERROR, WARNING or OPEN findings, including floating pins, no-connect handling, driver conflicts, shorted components, power pins, single-pin nets, undriven nets, pull-ups and decoupling.
  • Board setup remains 84 × 84 mm, R10 rounded rectangle, 4 copper layers.
Blockers and residuals
  • No blocker prevented completion.
  • The exact MPN was absent from the pre-existing Flux library, but it was sourceable and an exact verified part was successfully created; this was not treated as a substitution.
  • 154 airwires remain because the full board is intentionally not routed in this scope.
  • Public LCSC pages do not expose JLCPCB Basic/Extended assembly classification reliably; confirm classification in the JLCPCB BOM/parts interface before freezing the assembly BOM.
  • Scope status

  • IMU sourcing evidence

  • Added DNP designators and assembly handling

  • IMU wiring

  • Verified PCB placement

  • Microphones and dedicated decoupling

  • Acoustic ports

  • UI, RF and mechanical

  • DNP IMU block PCB placement

  • Route cleanup and validation evidence

  • Blockers and residuals