Display Migration Fix


All right, can you help me continue making the project? The last thing I asked for was to change the display, and this is the last message from another thread. The other thread got bugged, and it didn't continue. Can you help me just continue the work from the other session, please?

image

I can continue from that exact state. I’ll inspect the migrated GDEM0154D67WT subsystem and prior changes, resolve or document the DS1:VPP classification, verify FPC orientation and ERC, then re-place the PCB for the larger panel within the custom 40 × 36 mm watch outline and validate it before routing.
This requires project editing and verification, so please continue in Agent mode.
The ERC fixes, mechanical verification, and PCB re-placement require Agent mode. Click the Continue in Agent Mode button and I’ll resume from the migrated display state.
Continue in Agent Mode

Placement Checkpoint Correction Report
Scope status

Table


ItemStatusResult
Preserve board outline and stackupCompletedCustom 40 × 36 mm stepped outline and 0.65 mm six-layer HDI stackup were not changed.
Correct initial component placementCompletedAll 90 PCB-included components are placed: 65 Top / 25 Bottom. Placement validation reports 0 body overlaps and 0 out-of-bounds components.
Clear PPG, battery, dock, and thermal reservationsCompletedNo foreign component body intersects the U4 optical window, battery body envelope, dock reservation, or U6 thermal moat.
Correct rear access and tall partsCompletedJ1 and L5 were moved to Bottom; debug pads were moved to an exposed rear-right column.
Confirm E-Ink active-area and flex-tail datumBlocked by source dataThe panel outline and active-area size are verified, but per-edge active-area offsets and the flex-tail exit/contact datum are not explicitly documented. The related layout annotations are marked PROVISIONAL.
Place ANT1 fully outside the display projectionBlocked by fixed geometryThe antenna Type-2 region cannot fit outside the centered panel projection on the unchanged 40 mm board width.
Certify every remaining Top component under the panelBlocked by enclosure dataThe available enclosure/panel-to-PCB cavity height is unspecified, and several generic passive package heights are not verified.
RoutingUnattempted by instructionNo traces were routed; airwires are expected.
Changes made
  • J1: moved Top → Bottom to (-4.5, -15.6) mm, rotated 180° for outward bottom-edge access. J1 is a 1.5 mm-high right-angle side-entry connector requiring top actuator access.
  • L5: moved Top → Bottom to (16.5, -5.8) mm. Its maximum height is 1.8 mm.
  • D5: moved Bottom → Top to free the rear-right volume for L5.
  • TP7–TP11: moved to a Bottom-side column at x = 14 mm, y = 5.5/8/10.5/13/15.5 mm.
  • C17/C18/C19: moved out of the PPG optical and battery envelopes.
  • D1/D2: moved upward to clear the dock reservation.
  • Q1, D6–D8, R16/R17, C29/C30: compacted into the lower-right display booster chain between J1 and L5.
  • C28/C31/C32/C33 and C34/C35/C36/C37: arranged as two compact display-capacitor rows outside the U6 moat.
  • U6 thermal island: U6 and local decoupler C23 remain inside a 6 × 5 mm island. R10 and all unrelated parts are outside. Four all-layer 0.8 mm moat zones form a 7.6 × 6.6 mm outer boundary.
  • Replaced ambiguous display annotations with:
    • GDEM0154D67WT Active Window 27x27 PROVISIONAL OFFSET
    • GDEM0154D67WT Rear FPC Fold Corridor PROVISIONAL TAIL DATUM
  • Disabled generated fill, via nodes for this explicitly unrouted checkpoint. Readback confirms the virtual GND fill and two island vias have active: false. Restore/regenerate fills and vias after routing with final mechanical keepouts.
Mechanical verification
Panel
The GDEM0154D67WT rigid outline is 31.8 × 37.32 × 1.0 mm, and the active area is 27 × 27 mm. The layout uses the panel rotated to a 37.32 mm horizontal × 31.80 mm vertical projection. The datasheet does not explicitly provide per-edge active-window offsets or a citable flex-tail exit/contact orientation, so centered active-window and fold-corridor positions are not certified.
PPG, battery, dock, and temperature sensor
  • U4 optical window: 6 × 7 mm; only U4 occupies the Bottom-side window.
  • Battery envelope: current physical projection is 25.5 × 20.5 mm centered at approximately (-1, 6.05) mm. Intended BT1/TH1 lead features remain; C17/C18/C19 and debug pads are outside.
  • Dock reservation: J1 ends at x = 4.95 mm; dock reservation begins at x = 5.5 mm. D1/D2 end above y = -12.25 mm; the dock reservation begins below y = -12.5 mm.
  • U6 moat: placement validation initially found R15/C28/C34 intrusions; these were moved. Final validation reports no thermal-moat component intrusion.
Z-height evidence and remaining cavity risk
  • J1: 1.5 mm high, moved to Bottom.
  • L5: 1.8 mm max, moved to Bottom.
  • U1: 0.5 mm max package height.
  • U3: 0.524 mm max WLCSP39 package height.
  • ANT1: 0.60 ± 0.10 mm height; Type-2 empty-space region is 6.3 × 4.0 mm (drawing-derived keepout dimensions are cited but not machine-verified).
  • SW1/SW2: listed height 1.35 mm, already on Bottom; drawing tolerance is ±0.2 mm.
The remaining Top-side components cannot be certified under-panel until the enclosure cavity height and generic package heights are defined.
RF feasibility blocker
With the centered panel projection:
  • Panel right edge: x = 18.66 mm.
  • Board right edge: x = 20.00 mm.
  • Available lateral strip: 1.34 mm.
  • Type-2 antenna empty-space width in the current orientation: 4.00 mm.
  • Deficit: 2.66 mm.
Therefore ANT1 cannot be entirely outside the panel projection while retaining the current panel position, Type-2 reservation, and 40 mm board width. Minimum width is approximately:
  • 41.92 mm if the panel can shift left and 0.3 mm board-edge margins are retained.
  • 45.92 mm if the panel remains centered and the board expands symmetrically.
This is a real geometry conflict, separate from the internal placement checker's benign report that ANT1 lies inside its own copper-only body keepout. The formal DRC reports no keepout errors.
Validation evidence
  • Placement mutation validation: 0 overlaps, 0 out-of-bounds.
  • Formal DRC at 2026-09-07 20:53 UTC: no ERROR/WARNING checks for component outside board, body overlap, pad-access clearance, edge placement, keepout, protected intrusion, invalid layer, stackup validation, or overlapping copper.
  • Stackup readback: custom six-layer HDI, approximately 0.65 mm, with through via plus top/bottom microvia definitions preserved.
  • Generated fill/via readback: active: false under ruleset Placement checkpoint disable pre-route fills and vias.
  • No routing was added.
  • Scope status

  • Changes made

  • Mechanical verification

  • Panel

  • PPG, battery, dock, and temperature sensor

  • Z-height evidence and remaining cavity risk

  • RF feasibility blocker

  • Validation evidence