This session advanced both remaining workstreams, but neither final report could be retrieved and independently reconciled before execution stopped.
Confirmed PCB state from the last available report
- Copper overlaps: 0
- Dangling/redundant traces: 0
- Airwires reduced from 15 to 3
- Remaining nets at that checkpoint:
CHG_EN2, PGOOD_STATUS, and REG_PS_SYNC
- Remaining checks included 14 TPS63031 power-stage findings and one pre-existing U1 keepout finding
- A continuation was launched to resolve these issues with permitted local placement/routing changes, but its completed result still needs inspection and a fresh full DRC
Enclosure
- The ASA enclosure build was launched with requirements for separate base, lid, four-screw gasketed battery door, J2 service access, cable strain relief, USB-C/M8 access, and BLE antenna clearance.
- The build later reported completion, but its assets, fit checks, and validation report still need to be inspected before the enclosure can be accepted.
Still required
- Read and verify both completed build reports
- Run fresh PCB airwire, DRC, SMPS-placement, and keepout checks
- Inspect enclosure assets and verify battery fit, J2 access, gasket geometry, strain relief, connector mating paths, and antenna clearance
- Update the task status based on those verified results
Execution stopped because your ACUs ran out.